Overview
Correct installation of the HYRIG 4" 7500psi Demco high‑pressure mud valve – the largest and highest pressure model in the DEMCO line – is critical to ensuring safe, leak‑free operation at extreme pressures. Due to the large size and weight of this valve (approximately 350-450 lbs), proper lifting equipment and careful handling are essential.
Valve Dimensions by Connection Type
| Connection | Height (mm) | Width (mm) |
|---|---|---|
| Butt-Weld (BW) | 660 | 350 |
| RTJ Flanged | 660 | 430 |
| Hammer Union | 660 | 360 |
RTJ Flange Detailed Data
Flange O.D.: 292 mm
Bolt Quantity/Size: 8 bolts, 7/8" diameter
RTJ Ring: R-27
Bolt Circle: Standard API 6A high‑pressure dimensions
Butt‑Weld End Preparation
Schedule: XXH (Extra Extra Heavy)
Material: 4130 Alloy Steel compatible
Pre‑heat and post‑weld heat treatment (PWHT) required per API 6A
Prior to welding, the seat and bonnet seal must be removed from the valve body
Step‑by‑Step Installation Procedure
Step 1: Pre‑Installation Checks
Verify the valve size (4"), pressure rating (7,500 PSI), and connection type match your piping.
Inspect all sealing surfaces for transit damage.
Ensure the valve is in the fully closed position before installation.
Verify lifting equipment capacity for heavy valve (350-450 lbs).
Step 2: Orientation & Clearance
Install with the flow arrow pointing downstream.
For rising stem valves, provide adequate vertical clearance for full stem extension.
Ensure the large‑bore handwheel has clearance for full rotation.
Step 3: Connection‑Specific Mounting
Butt‑Weld (BW) :
Remove seat and bonnet seals before welding.
Use XXH schedule pipe with 4130 compatible material.
Apply pre‑heat and perform post‑weld heat treatment (PWHT) per API 6A.
Allow cooling before reinstalling seals.
RTJ Flanged :
Install RTJ ring (R‑27) in the groove.
Align flange bolt holes.
Install bolts (8 bolts, 7/8") and tighten in star pattern.
Torque to API 6A high‑pressure recommended values.
Hammer Union :
Align union halves.
Install HP O‑ring seal.
Tighten union nut with hammer wrench to API recommended torque.
Step 4: Post‑Installation Testing
Perform hydrostatic test per API 6A requirements (test pressure: 11,250 PSI).
Check all connections for leaks.
Cycle valve fully open and closed to verify smooth operation.
Step 5: Lubrication
Apply high‑pressure compatible grease through grease fitting (STD-HP01).
Use grease suitable for high‑pressure and high‑temperature service.
Critical Installation Notes
This is the largest and heaviest DEMCO mud valve model – use proper lifting equipment.
Do not use any 5,000 PSI rated components or seals in this 7,500 PSI valve.
For sour service (H₂S), ensure all materials are NACE MR‑01‑75 compliant.
Use only high‑pressure rated fasteners (B7/L7).
For detailed torque charts or installation troubleshooting, contact info@hyrig.com.