GN Drilling Rig Solids Control System | Mud System
Overview:
HYRIG supplies the GN Drilling Rig Solids Control System and its replacement parts. This complete system includes all solids control equipment and mud tanks for efficient drilling operations.
The system uses a 4-stage separation process: 1st stage GN Shale Shaker, 2nd/3rd stage GN Mud Cleaner, and 4th stage GN Decanter Centrifuge. The mud is stored and mixed in the mud tanks.
Used globally in oil and gas drilling operations for primary mud treatment and recycling.
HYRIG provides a full range of replacement parts for the entire GN Drilling Rig Solids Control System.
Specifications:
Contact Us:
For GN Drilling Rig Solids Control System selection and spare parts, contact HYRIG: info@hyrig.com
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.