RG Petro JZ500 Deadline Anchor | Weight Indicator System
Overview:
HYRIG can supply the RG Petro JZ500 deadline anchor and its components. The JZ series weight indicator conforms to API Spec 8A and 8C standards. It is used to measure the hook load and provide critical weight data to the driller.
| Dimension Item | Specification |
|---|---|
| Installation | Mounted on the rig floor or mast |
| Hole Qty x (in) | 15.74 x 19.688 x 20.4 |
The deadline anchor fixes the dead end of the drilling line and uses a load cell to measure the tension in the line. This data is transmitted to the weight indicator gauge in the driller's cabin, allowing the driller to monitor the weight on bit (WOB) and overall hook load.
When replacing a deadline anchor, verify the maximum load capacity and the installation orientation (vertical or horizontal). The vertical type requires the L-type bottom to be bolted vertically to the rig.
Need help selecting the right deadline anchor for your rig? Tell us your maximum hook load and installation space, and our engineers will provide the correct model. For the complete hoisting system, view Hoisting Equipment.
Used in the hoisting system of drilling rigs to ensure accurate weight measurement for safe and efficient drilling operations.
Disclaimer: This equipment is designed for hazardous environments. Ensure strict compliance with local safety standards and verify certification documents prior to operation.
We supply replacement parts including the load cell, gauge, and hydraulic hoses for the JZ series weight indicator.
Specifications:
FAQ:
Contact Us:
For RG Petro JZ500 deadline anchor selection and spare parts, contact HYRIG: info@hyrig.com
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.