| Condition | Action |
|---|---|
| Matching pipe size to packer size | Always use C.S.O. (Closed Seal Opening) diameter, not nominal pipe OD |
| Operating in sour gas (H2S) wells | Specify HNBR or NBR elastomer with NACE MR0175 certification |
| Verifying metal part interchangeability | Ensure the ram block matches the LWS door geometry and locking mechanism |
Common field error: using a standard nitrile packer in temperatures exceeding 250°F (121°C) or in high H2S concentration leads to rapid seal degradation.
Email info@hyrig.com with your current BOP model and pressure rating, the C.S.O. size required, and H2S / CO2 concentration. HYRIG engineers will confirm interchangeability before quotation.
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.