XBSY WJQ5×6J-45kW Shear Pump — Polymer and Clay Shearing Pump
Overview:
HYRIG can supply the XBSY WJQ5×6J-45kW shear pump and its spare parts. The XBSY WJQ5×6J-45kW is a turbine shear pump designed for shearing polymers and clays before they are added to the drilling fluid system.
Working Principle
According to the manual, fluid enters at "V" and is pumped parallel to the shear plate "P". The chambers scoop 50% of the volume being pumped and jet that fluid through 44 nozzles "N" and impact the shear plate "P" at very high velocity at "M", 90 degrees to the fluid entering the pump. The total fluid "V" and "N" travels down the shear plate to "T", where the fluid is further sheared due to the shape and speed of the plate tip. Fifty percent of the fluid is sheared twice each time through the pump.
Important Warning
The manual states: "This pump can not be used on active mud system since it will shear drill solids and barite. These solids will also damage pump very quickly." This warning should be observed in all applications.
Installation Requirements
- Locate the pump near the liquid source so the suction line can be short and losses reduced.
- The foundation should be sufficiently rigid and substantial to absorb vibration and support the base plate at all points.
- The base plate should be installed in a level position.
- For pulley installation, the axes of two pulleys must be parallel and the end surface error cannot exceed 2 mm; belts should be aligned and tightened; the electric motor must be mounted stably.
- The suction line should be equal to or larger than the pump suction.
- The suction line should not be throttled; a positive shut-off valve may be installed for pump removal and maintenance.
- The suction line should eliminate air pockets and slope gradually downward to the supply source.
- The suction line should have a straight section into the pump of at least two times its diameter.
- For temporary flexible hose, use a non-collapsing hose.
- A positive shut-off valve should be located in the discharge pipe.
- All pipes should be independently supported and accurately aligned; the pump must not support pipe weight.
- If operating conditions are not known accurately, provide a throttle valve in the discharge line.
- If connected to a pressurized system, install a check valve between the discharge and throttling valve to prevent back flow.
Operation
Preparation:
- Pump rotates freely by hand.
- Check the pump rotation direction; the correct direction is shown by an arrow on the casing.
- Open the suction valve fully.
- Fill the pump and suction line with fluid to vent air.
Running:
- Start the motor after completing all preparations.
Lubrication:
- Add a good grade of 30# weight motor oil until the middle level of the dipstick. Do not overfill.
- Oil should be changed every 90 days or 1000 hours.
- Under special conditions, a grease that can dissolve with the motor oil may be selected for lubrication.
Maintenance and Inspection
- The pump employs mechanical seal as its primary seal and packing seal as its secondary seal. Packing seal can be compacted only when the mechanical seal is disabled; otherwise the seal may be damaged.
- No-load running time cannot exceed 5 seconds. The pump must run filled with liquid slurry; otherwise the mechanical seal may be damaged.
- Impeller: replace if excessive erosion, corrosion, extreme wear, or vane breakage.
- Shaft: replace if run-out exceeds 0.05 mm; bearing seats and oil seal area must be smooth and free of scratches or grooves.
- Shaft sleeve: replace if grooved.
- Oil seal: removed oil seal must be replaced.
- Ball bearings: replace if worn, loose, or rough and noisy when rotated.
- O-rings and gaskets: recommended to remove and replace during disassembly; reuse only if not worn or damaged.
- During assembly, the clearance between the back of the impeller and the protecting plate is 0.6 mm.
- Packing gland should be tightened finger tight only; over-tightening may burn the packing when the pump is started.
Parts and Exploded View
The manual includes a shear pump exploded drawing and a shear pump set exploded drawing. Key part numbers include:
| Item | Description | Part No. | Qty |
|---|
| 2 | Impeller set | WJQ56J0002 | 1 |
| 3 | Shear plate | WJQ56J0003 | 1 |
| 12 | Oil seal | WJQ56J0012 | 2 |
| 13 | Bearing | WJQ56J0013 | 2 |
| 18 | Bearing | WJQ56J0018 | 2 |
| 25 | Shaft | WJQ56J0025 | 1 |
| 44 | Sleeve, shaft | WJQ56J0044 | 1 |
| 45 | Mechanical seal | WJQ56J0045 | 1 |
The full 58-item main pump parts list and 30-item set drawing parts list are on the WJQ5×6J parts and exploded view page.
Specifications:
- Model: WJQ5×6J-45kW
- Capacity: 105 m³/h
- Head: 24 m
- Speed: 1750 r/min
- Efficiency: 28%
- NPSH: 2.825 m (as listed; verify against original PDF)
- Shaft power: 45 kW (as listed; verify against original PDF)
- Motor power: 45 kW
- Seal: Mechanical seal (primary), packing seal (secondary)
- Turbine: 300-series stainless steel, 44 nozzles, four scoops, shear plate
- Hopper: ZHP150 special hopper with nozzle sized for this application
- Data source: Shear Pump Directions For Installation And Operation, Table 1 and Section 2. The NPSH and shaft power fields for this model should be verified against the original PDF before ordering.
- Applications: According to the manual, the WJQ5×6J shear pump is used to: - Highly shear polymers or clays before adding them to the drill fluid system. - Improve drill fluid properties. - Reduce bentonite clay needed by 33% or more and polymer needed by 15% or more (as stated in the manual). - Improve fluid loss and filter cake, build gel strength and low-shear-rate viscosity to better hold up solids.
FAQ:
- Q1: What is the XBSY WJQ5×6J-45kW shear pump? A1: It is a turbine shear pump designed for shearing polymers and clays before they are added to the drilling fluid system.
- Q2: What are the listed capacity and head? A2: The manual lists 105 m³/h capacity and 24 m head.
- Q3: Can this pump be used on an active mud system? A3: No. The manual warns that the pump cannot be used on an active mud system because it will shear drill solids and barite, and these solids will damage the pump very quickly.
- Q4: What is the no-load running limit? A4: No-load running time cannot exceed 5 seconds; the pump must run filled with liquid slurry.
- Q5: How often should bearing oil be changed? A5: Every 90 days or 1000 hours of operation, using 30# weight motor oil to the middle level of the dipstick.
- Q6: What is the impeller-to-protecting-plate clearance? A6: 0.6 mm.
Contact Us:
For XBSY WJQ5×6J-45kW shear pump selection, installation information or spare parts, contact HYRIG: info@hyrig.com