Overview
The HYRIG 2" 5000psi Demco mud valve features a modular, top-entry design that allows for complete inline servicing. This means you can perform maintenance without removing the valve body from the pipeline, significantly reducing downtime.
Safety First
Depressurize the system completely and isolate the valve before starting.
Wear appropriate PPE and use proper lifting techniques for heavy parts.
Disassembly Procedure
Step 1: Top Works Removal
Remove the handwheel assembly (M2031-HANDLE) and unbolt the bonnet stud nuts.
Carefully lift the bonnet (J001031-05) straight up and remove the bonnet seal.
Step 2: Internal Extraction
Remove the stem screw and withdraw the stem (M2031-03).
Extract the gate (M2031-02) through the bonnet opening.
Remove the stem packing (Neo/Fabric).
Step 3: Seat & Bushing Removal
Remove the seat seal assembly (M2031-04), secondary seal, and retainer.
Extract the bushing and retaining ring (M2031-06) and the grease fitting (STD-001) if required.
Inspection Checklist
Gate (M2031-02): Check for scoring, deformation, or excessive wear.
Stem (M2031-03): Inspect for bending, thread damage, or galling.
Seats & Seals: Look for hardening, cracking, or tearing.
Bushings (M2031-06): Check for ovality or scoring.
Assembly Procedure (Reverse Order)
Step 1: Clean all components and apply a light coat of compatible lubricant. Prepare the appropriate kit (Minor M2031-MINOR or Major M2031-MAJOR).
Step 2: Install new bushings, seat seals, and secondary seals.
Step 3: Insert the new gate, install the stem with new packing, and tighten the stem screw.
Step 4: Install a new bonnet seal, lower the bonnet, and tighten the stud nuts in a star pattern to the specified torque.
Step 5: Reattach the handwheel.
Step 6: Perform a hydrostatic test per API 6A to verify integrity and cycle the valve to ensure smooth operation.
For a detailed torque specification sheet, request one at info@hyrig.com.