2" 5000psi Demco Mud Valve – Disassembly & Assembly Step‑by‑Step | HYRIG

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
Step‑by‑step disassembly/assembly for 2" 5000psi Demco mud valve: depressurize, remove handwheel, unbolt bonnet, extract stem and gate, remove seats and bushings. Inspect and replace worn parts using Minor or Major kits. Reassemble in reverse, test hydrostatically.

Conatct For Details
DetailReview(0)Additional

Overview
The HYRIG 2" 5000psi Demco mud valve features a modular, top-entry design that allows for complete inline servicing. This means you can perform maintenance without removing the valve body from the pipeline, significantly reducing downtime.

Safety First

  • Depressurize the system completely and isolate the valve before starting.

  • Wear appropriate PPE and use proper lifting techniques for heavy parts.

Disassembly Procedure

Step 1: Top Works Removal

  • Remove the handwheel assembly (M2031-HANDLE) and unbolt the bonnet stud nuts.

  • Carefully lift the bonnet (J001031-05) straight up and remove the bonnet seal.

Step 2: Internal Extraction

  • Remove the stem screw and withdraw the stem (M2031-03).

  • Extract the gate (M2031-02) through the bonnet opening.

  • Remove the stem packing (Neo/Fabric).

Step 3: Seat & Bushing Removal

  • Remove the seat seal assembly (M2031-04), secondary seal, and retainer.

  • Extract the bushing and retaining ring (M2031-06) and the grease fitting (STD-001) if required.

Inspection Checklist

  • Gate (M2031-02): Check for scoring, deformation, or excessive wear.

  • Stem (M2031-03): Inspect for bending, thread damage, or galling.

  • Seats & Seals: Look for hardening, cracking, or tearing.

  • Bushings (M2031-06): Check for ovality or scoring.

Assembly Procedure (Reverse Order)

Step 1: Clean all components and apply a light coat of compatible lubricant. Prepare the appropriate kit (Minor M2031-MINOR or Major M2031-MAJOR).
Step 2: Install new bushings, seat seals, and secondary seals.
Step 3: Insert the new gate, install the stem with new packing, and tighten the stem screw.
Step 4: Install a new bonnet seal, lower the bonnet, and tighten the stud nuts in a star pattern to the specified torque.
Step 5: Reattach the handwheel.
Step 6: Perform a hydrostatic test per API 6A to verify integrity and cycle the valve to ensure smooth operation.

For a detailed torque specification sheet, request one at info@hyrig.com.


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit