Comprehensive dimensions and installation procedure for 2" 5000psi Demco mud valve. Threaded height 397mm, BW same, flanged 397mm height and 295mm width. RTJ flange 8‑7/8" bolts, R‑24 ring. Includes welding prep, orientation, torque, and hydrostatic testing.

Conatct For Details
DetailReview(0)Additional

Overview
Correct installation of the HYRIG 2" 5000psi Demco mud valve is essential to ensure safe, leak-free operation and maximum service life. This guide provides all necessary dimensional data and a step-by-step installation procedure in full compliance with API 6A standards.

Valve Dimensions by Connection Type

ConnectionHeight (mm)Width (mm)OEM Part Ref.
Threaded (NPT)397229J001028 / M2028
Butt-Weld (BW)397229J001031 / M2031
RTJ Flanged397295J001025 / M2025

RTJ Flange Detailed Data

  • Flange O.D.: 216 mm

  • Bolt Quantity/Size: 8 bolts, 7/8" diameter

  • RTJ Ring: R-24

Step-by-Step Installation Procedure

Step 1: Pre-Installation Checks

  • Verify the valve size, pressure rating, and connection type match your piping.

  • Inspect all sealing surfaces for transit damage.

  • Ensure the valve is in the fully closed position.

Step 2: Orientation & Clearance

  • Install with the flow arrow pointing downstream.

  • Provide adequate vertical clearance for the rising stem's full travel.

Step 3: Connection-Specific Mounting

  • Butt-Weld (BW): Remove seat and bonnet seals before welding. Use XXH schedule pipe, apply pre-heat, and perform post-weld heat treatment (PWHT) per API 6A.

  • Threaded (NPT): Apply appropriate thread sealant and torque to recommended values. Do not over-tighten.

  • RTJ Flanged: Install the R-24 ring, align bolt holes, and torque the 7/8" bolts in a star pattern to API specifications.

  • Hammer Union: Align halves, install the O-ring, and tighten the nut with a hammer wrench to standard torque.

Step 4: Post-Installation Testing

  • Perform a hydrostatic test per API 6A requirements.

  • Cycle the valve fully open and closed to verify smooth operation.

  • Lubricate through the grease fitting (STD-001) using media-compatible grease.

Critical Note: For sour (H₂S) service, ensure all seals and body materials are NACE MR-01-75 compliant before commissioning.

For detailed torque charts or installation troubleshooting, contact info@hyrig.com.