Step‑by‑step disassembly/assembly for 2" 7500psi Demco HP mud valve: depressurize, remove handwheel, unbolt bonnet, extract stem and gate, remove seats and bushings. Inspect and replace worn parts using M2031-HP-MINOR or M2031-HP-MAJOR kits. Reassemble in reverse, HP hydrostatic test.
Full Description
Overview
The HYRIG 2" 7500psi Demco high‑pressure mud valve features a modular, top‑entry design that allows for complete inline servicing. Due to the extreme pressures involved, special attention to safety and proper torque procedures is essential. All replacement parts must be from the M2031-HP series – never use 5,000 PSI components in this HP valve.
Safety First – HP Precautions
Depressurize the system completely and verify zero pressure before valve disassembly.
Isolate the valve from all pressure sources with double block and bleed.
Wear appropriate PPE including impact‑resistant eye protection and heavy gloves.
Use proper lifting equipment for heavy HP components.
Refer to API 6A high‑pressure safety guidelines.
Required Tools
Appropriate wrenches and socket sets (HP rated)
Torque wrench capable of HP torque values
Soft‑faced hammer
HP seal installation tools
Cleaning materials and HP‑compatible lubricants
Lifting equipment (chain hoist or overhead crane)
Disassembly Procedure
Step 1: Preparation
Close the valve completely.
Depressurize and drain the line. Verify zero pressure.
Remove the handwheel assembly (M2031-HP-HANDLE).
Note: The bonnet assembly can be quickly removed for internal parts inspection.
Step 2: Bonnet Removal
Remove bonnet stud nuts (4 or 8 nuts, HP specification).
Use proper lifting equipment to carefully lift the bonnet assembly (M2031-HP-05) straight up.
Remove the bonnet seal (HNBR).
Inspect bonnet and body sealing surfaces for damage or pitting.
Step 3: Stem and Gate Removal
Remove the stem screw.
Extract the oversized stem assembly (M2031-HP-03).
Remove the thickened gate (M2031-HP-02) through the bonnet opening.
Note: The gate is a monolithic solid gate construction with T‑slot design, thickened for HP service.
Remove the stem packing (HNBR/Fabric).
Step 4: Seat and Seal Removal
Remove the HP seat seal assembly (M2031-HP-04).
Extract the secondary seal.
Remove the retainer and screw seal.
Step 5: Bushing and Hardware Removal
Remove the HP bushing and explosion‑proof retaining ring set (M2031-HP-06).
Remove the grease fitting (STD-HP01) if replacement is needed.
Remove all HP fasteners for inspection.
Inspection Checklist (HP Specific)
| Component | Inspection Points | Action if Damaged |
|---|---|---|
| Body | Cracks, pitting, HP sealing surface damage | Replace or repair |
| Bonnet | Cracks, seal groove damage, deformation | Replace |
| Gate (M2031-HP-02) | Wear, scoring, deformation under HP | Replace |
| Stem (M2031-HP-03) | Bending, wear, thread damage, galling | Replace |
| Seats (M2031-HP-04) | Wear, elastomer degradation, HP damage | Replace |
| Seals (HNBR) | Hardening, cracking, deformation | Replace |
| Bushings (M2031-HP-06) | Wear, scoring, HP stress marks | Replace |
| Fasteners | Stretching, corrosion, thread damage | Replace |
Assembly Procedure (Reverse Order)
Step 1: Preparation
Clean all components thoroughly.
Inspect all sealing surfaces.
Apply HP‑compatible lubricant to all moving parts.
Have replacement parts ready (use M2031-HP-MINOR or M2031-HP-MAJOR kit).
Step 2: Seat and Seal Installation
Install new HP seat seal assembly (M2031-HP-04).
Install new secondary seal.
Install new retainer.
Install new screw seal.
Step 3: Bushing and Hardware Installation
Install new HP bushing and retaining ring set (M2031-HP-06).
Install new grease fitting (STD-HP01) if replacing.
Step 4: Stem and Gate Installation
Insert the gate (M2031-HP-02) into the body.
Align the gate T‑slot with the stem.
Install the stem assembly (M2031-HP-03).
Install new stem packing (HNBR/Fabric).
Install and tighten the stem screw.
Step 5: Bonnet Installation
Install new bonnet seal (HNBR).
Carefully lower the bonnet assembly (M2031-HP-05) onto the body.
Install bonnet stud nuts.
Tighten nuts in star pattern to HP specified torque.
Step 6: Handwheel Installation
Install the handwheel assembly (M2031-HP-HANDLE).
Verify smooth operation.
Step 7: Post‑Service HP Testing
Perform hydrostatic test per API 6A requirements (test pressure: 11,250 PSI).
Cycle valve fully open and closed to verify smooth operation.
Check all seals for leaks under pressure.
Lubricate through HP grease fitting.
Critical HP Maintenance Tips
NEVER use 5,000 PSI rated parts in this HP valve.
Use only M2031-HP‑specified replacement parts.
HNBR is the only seal material – do not substitute NBR.
Document all maintenance activities for traceability.
For a detailed torque specification sheet, request one at info@hyrig.com.