Overview
Correct installation of the HYRIG 4" 5000psi Demco mud valve is essential to ensure safe, leak‑free operation and maximum service life. This guide provides all necessary dimensional data and a step‑by‑step installation procedure in full compliance with API 6A standards.

Valve Dimensions by Connection Type

ConnectionHeight (mm)Width (mm)OEM Part Ref.
Threaded (NPT)630330J007419 / M8419
Butt-Weld (BW)630330J007420 / M8420
RTJ Flanged630405J007421 / M8421

RTJ Flange Detailed Data

  • Flange O.D.: 292 mm

  • Bolt Quantity/Size: 8 bolts, 7/8" diameter

  • RTJ Ring: R-27

  • Bolt Circle: Standard API 6A dimensions

Butt‑Weld End Preparation

  • Schedule: XXH (Extra Extra Heavy)

  • Material: 4130 Alloy Steel compatible

  • Pre‑heat and post‑weld heat treatment (PWHT) required per API 6A

  • Prior to welding, the seat and bonnet seal must be removed from the valve body

Step‑by‑Step Installation Procedure

Step 1: Pre‑Installation Checks

  • Verify the valve size, pressure rating, and connection type match your piping.

  • Inspect all sealing surfaces for transit damage or contamination.

  • Ensure the valve is in the fully closed position before installation.

Step 2: Orientation & Clearance

  • Install with the flow arrow pointing downstream.

  • For rising stem valves, provide adequate vertical clearance for full stem travel.

  • Ensure the visual position window is accessible for inspection.

Step 3: Connection‑Specific Mounting

  • Butt‑Weld (BW) :

    • Remove seat and bonnet seals before welding.

    • Use XXH schedule pipe with 4130 compatible material.

    • Apply pre‑heat and perform post‑weld heat treatment (PWHT) per API 6A.

    • Allow cooling before reinstalling seals.

  • Threaded (NPT) :

    • Apply appropriate thread sealant compatible with service media.

    • Tighten to recommended torque values.

    • Do not over‑torque; avoid damage to threads.

  • RTJ Flanged :

    • Install RTJ ring (R‑27) in the groove.

    • Align flange bolt holes.

    • Install bolts (8 bolts, 7/8") and tighten in star pattern.

    • Torque to API 6A recommended values.

  • Hammer Union :

    • Align union halves.

    • Install O‑ring seal.

    • Tighten union nut with hammer wrench to API recommended torque.

Step 4: Post‑Installation Testing

  • Perform hydrostatic test per API 6A requirements.

  • Check all connections for leaks.

  • Cycle valve fully open and closed to verify smooth operation.

Step 5: Lubrication

  • Apply grease through grease fitting (STD-001).

  • Use grease compatible with service media and temperature.

Critical Installation Notes

  • Avoid collisions and damage to the valve during the installation process.

  • Ensure connections are firmly secured to the pipeline.

  • For sour service (H₂S), use NACE‑compliant materials and seals.

  • The visual position window should be kept clean for accurate reading.

For detailed torque charts or installation troubleshooting, contact info@hyrig.com.