9703320000 Lower IBOP for BPM DQ50BSC – Well Control & Safety

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
The 9703320000 Lower IBOP provides secondary well control on the BPM DQ50BSC top drive. Manual backup barrier if hydraulic upper IBOP fails, allows pressure equalization, enables safe removal of upper IBOP under pressure. Essential for dual barrier well control in deep drilling.

Conatct For Details
DetailReview(0)Additional

The Role of the Lower IBOP in Dual Barrier Well Control

On a BPM DQ50BSC top drive, the 9703320000 Lower IBOP provides redundant isolation inside the drill string. While the upper IBOP (9703340000) is hydraulically actuated through the PLC control system and serves as the primary barrier, the lower IBOP is manually operated and serves as the secondary barrier. Dual IBOP configuration is recommended for critical wells, especially in deep or high-pressure drilling.

Why Two IBOPs on DQ50BSC

ScenarioUpper IBOP (hydraulic)Lower IBOP (manual)
Normal drillingOpen (PLC controlled)Open
Before breaking connectionClosed (hydraulic)Open (or closed)
Upper IBOP leaks when closedLeakingClosed – contains pressure
Upper IBOP fails to closeFailed openClosed – provides isolation
Hydraulic system failureInoperableManual – fully functional
Need to service upper IBOPRemovedClosed – allows safe removal

The manual operation of the lower IBOP is a critical advantage during hydraulic system failure or electrical control system malfunctions. Unlike the upper IBOP which requires hydraulic pressure and PLC signals to operate, the 9703320000 can be closed or opened using a simple manual wrench under any rig condition.

When to Close the Lower IBOP on DQ50BSC

1. As a Backup During Well Control

Upon detecting a kick, the driller closes both upper and lower IBOPs. This ensures that even if the hydraulic upper IBOP has minor leakage or fails to seal completely, the manual lower IBOP will hold pressure.

Procedure: Stop pump → Close upper IBOP (hydraulic) → Close lower IBOP (manual) → Close BOPs.

2. When Upper IBOP Is Suspected of Leaking

If pressure testing shows a slow pressure drop when upper IBOP alone is closed, close the lower IBOP to confirm isolation. If pressure stabilizes, the upper IBOP requires maintenance or seal replacement.

3. During Hydraulic System Failure

If the DQ50BSC hydraulic system loses pressure or the PLC control system malfunctions, the upper IBOP may be inoperable. The lower IBOP remains fully functional as a manual valve and becomes the primary barrier.

4. To Allow Safe Maintenance of Upper IBOP

The lower IBOP can be closed and pressure bled off between the two valves. This creates a trapped pressure zone, allowing the upper IBOP to be removed and serviced while the drill string remains under pressure below.

5. During Long Trips (Without Float Valve)

When tripping pipe out of the hole and no float valve is present, both IBOPs should be closed at all times for absolute isolation.

Dual IBOP Operating Procedures for DQ50BSC

Normal Operation

  • Drilling / circulating: Both IBOPs open

  • Before breaking connection: Close upper IBOP (hydraulic). Lower IBOP may remain open unless well conditions require dual closure

Emergency Closure Sequence

StepAction
1Stop rotation and mud pump
2Actuate upper IBOP close via driller console (PLC/hydraulic)
3Verify upper IBOP closed via pressure monitoring
4Manually close lower IBOP using dedicated wrench
5Close annular BOP
6Record shut-in pressures (SIDPP, SICP)

Pressure Equalization

Before opening the upper IBOP when there is pressure trapped below:

  1. Close upper IBOP.

  2. Close lower IBOP (trap pressure between them).

  3. Open a small bleed valve or slowly crack the connection above the lower IBOP.

  4. Once pressure equalizes, open upper IBOP.

Note: The 9703320000 does not have a built-in equalization port. Equalization is accomplished via a separate bleed valve or by gradually loosening the connection above.

Upper IBOP Removal Under Pressure (Service Procedure)

StepAction
1Close lower IBOP (9703320000) manually
2Bleed pressure from the space between upper and lower IBOP via top drive washpipe or bleed valve
3Verify zero pressure in the space
4Remove upper IBOP for service
5Lower IBOP holds well pressure below

This procedure is critical for maintaining well control while servicing the upper IBOP.

Manual Operation of 9703320000

The 9703320000 is a manually operated ball valve. Operation instructions:

  • Close: Rotate clockwise using the dedicated wrench until fully closed

  • Open: Rotate counter-clockwise using the dedicated wrench until fully open

  • Always cycle fully open or fully closed – never leave partially open under pressure

  • The valve requires a specialized tool provided in the BPM tool kit (Part number: 9709320301, six-point socket wrench)

When Lower IBOP Becomes Primary Barrier

If the hydraulic upper IBOP fails (cannot close, leaks severely, or hydraulic system is inoperable), the manual lower IBOP becomes the primary barrier. In this mode:

  • Do not open lower IBOP unless absolutely necessary

  • Plan to replace or repair upper IBOP at the next connection or trip

  • If both IBOPs fail, rely on BOP stack and consider stripping procedures

Integration with BOP Stack

BarrierPurposeOperation
Upper IBOP (9703340000)Primary internal barrierHydraulic / PLC controlled
Lower IBOP (9703320000)Secondary internal backupManual wrench
Annular BOPSeals around drill pipe in annulusHydraulic
Ram BOPs (pipe & shear)Seal around pipe or cut and sealHydraulic

Best Practices for Dual IBOP Operations on DQ50BSC

  • Test both IBOPs separately – test lower IBOP with upper IBOP open, then test both closed

  • Cycle the lower IBOP manually every day – manual valves can seize if left static for long periods

  • Mark positions clearly – the manual valve should have open/closed indicator

  • Train drill crews on manual IBOP operation – the manual valve is often overlooked in well control drills

  • Keep the dedicated manual wrench at the driller station at all times

  • Log all pressure tests and maintenance activities for both IBOPs

Emergency Actions

If Lower IBOP 9703320000 Fails to Close

  1. Upper IBOP is still available as primary barrier (if hydraulic system functional)

  2. Strip back to BOPs and close annular and pipe rams

  3. Replace lower IBOP at the next trip

If Both Upper and Lower IBOPs Fail

  1. Immediately close annular BOP

  2. Close pipe rams if possible

  3. Consider shear rams if well continues to flow

  4. Pump barite plug or set bridge plug

If Manual Wrench is Not Available

  • A standard heavy-duty ratchet with appropriate socket may be used temporarily

  • Immediately source the correct tool (9709320301) for proper torque application

Common Mistakes to Avoid

  • Using lower IBOP as the primary barrier for routine connections – use upper IBOP first

  • Opening lower IBOP before verifying no pressure below – can cause well flow to surface

  • Forgetting to close lower IBOP before removing upper IBOP for service

  • Using incorrect wrench – may damage valve stem or fail to achieve full closure

  • Operating the valve too slowly during a kick – manual valves take time; practice speed

  • Neglecting low-pressure test on manual valve – small leaks may go undetected

Documentation and Training

We provide:

  • Dual IBOP well control worksheets for BPM DQ50BSC

  • Quick-reference cards for driller console

  • API test report templates

  • Manual operation procedure cards

Contact for Well Control Advisory

For training materials, emergency support, or spare lower IBOPs: info@hyrig.com

Also available: Upper IBOP 9703340000 to complete dual barrier isolation, and complete BPM DQ50BSC top drive spare parts inventory.


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit