9703320000 Lower IBOP for BPM DQ50BSC – Installation & Maintenance Guide

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
Installation and maintenance instructions for 9703320000 Lower IBOP on BPM DQ50BSC top drive. Thread preparation, torque requirements, pressure testing, seal replacement schedule, troubleshooting for reliable well control.

Conatct For Details
DetailReview(0)Additional

Proper Installation Procedure

Correct installation of the 9703320000 Lower IBOP on a BPM DQ50BSC top drive ensures reliable secondary well control. The DQ50BSC top drive employs advanced AC variable frequency drive technology with precise torque and speed control.

Installation Sequence (Dual IBOP Configuration)

Order from top drive down:

  1. Top drive spindle

  2. Upper IBOP 9703340000 (hydraulic)

  3. Lower IBOP 9703320000 (manual) – this product

  4. Saver sub / adapter (optional)

  5. Drill string

Before Installation

  1. Inspect the IBOP – Check for shipping damage, clean all surfaces.

  2. Verify threads – Confirm top and bottom connections match adjacent components.

  3. Check seal condition – Ensure NBR seals are not cracked or hardened.

  4. Prepare thread compound – Use API-approved thread lubricant.

Installation Steps

StepAction
1Apply thread compound to both the Lower IBOP top threads and mating connection (upper IBOP bottom).
2Hand-thread the Lower IBOP onto the upper IBOP until finger tight.
3Tighten to factory-specified torque using appropriate tools.
4Verify smooth manual operation using the dedicated wrench.
5Connect the bottom string (saver sub or drill pipe) to the lower IBOP bottom thread using same compound.

Pressure Testing After Installation

Per API specifications, test the lower IBOP both independently and as part of the assembly:

  1. Close lower IBOP, open upper IBOP. Apply 500 psi from below. Hold 5 minutes. No visible leakage.

  2. Close lower IBOP, open upper IBOP. Apply 5,000 psi from below. Hold 5 minutes. No pressure drop.

  3. Both IBOPs closed – test lower IBOP seal while upper IBOP is open.

  4. Both IBOPs open – perform shell test on lower IBOP (7,500 psi).

Document all test results for well control records.

Maintenance Schedule

IntervalAction
Daily / each tourCycle the valve fully open and closed. Check for smooth operation using the manual wrench.
WeeklyVisual inspection for damage or corrosion on body and connections.
Per API standards (14 days)Pressure test (low and high). Record results in well control log.
After 300 cycles or 6 monthsReplace seals (repair kit). Inspect ball and seats for wear.
After a well control eventDisassemble, inspect, replace seals regardless of cycle count.

Seal Replacement (Repair Kit)

The 9703320000 uses a standard NBR seal kit. Replacement procedure:

  1. Remove Lower IBOP from top drive assembly.

  2. Unscrew end pieces using appropriate tools.

  3. Extract ball, seats, and seals carefully.

  4. Clean all components with approved solvent.

  5. Inspect ball and seats for scoring, pitting, or wear – replace if damaged.

  6. Install new seals (lubricate with silicone grease).

  7. Reassemble and torque end pieces to factory specification.

  8. Pressure test before returning to service.

Repair kit part number: Contact info@hyrig.com for kit details.

Troubleshooting for BPM DQ50BSC

ProblemPossible CauseSolution
Hard to turnMud residue inside ball cavityFlush with clean fluid, lubricate
Hard to turnDifferential pressure too highEqualize pressure before operating
Leaks when closedWorn seat or ballReplace seals, inspect ball
Thread gallingInsufficient thread compoundClean threads, reapply compound
Cannot close fullyDebris in ball cavityRemove IBOP, disassemble and clean

Common Failure Modes and Prevention

Based on field experience with BPM top drive IBOPs, common failure modes include:

  • Thread galling from improper thread compound application – always use API-approved lubricant

  • Seal degradation from high-temperature exposure – monitor fluid temperature limits

  • Ball seizure from mud solidification – cycle valve regularly even when not in use

  • Corrosion in sour service – use NBR seals for standard service; for H₂S environments consult factory

Safety Notes

  • Always equalize pressure across the lower IBOP before attempting to operate it.

  • Use proper lifting equipment – IBOP weight approximately 45-55 kg.

  • Wear gloves when handling thread compound.

  • Use the designated manual wrench only – never use pipe wrenches on the IBOP body.

  • Always verify zero pressure before removing the IBOP.

Contact for Maintenance Support

For repair kits, special tools, or field service assistance: info@hyrig.com


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit