HYRIG can supply API Y-strainers. This FAQ addresses common engineering and procurement questions regarding installation, mesh selection, maintenance, and standard compliance.
Q: What is the correct installation orientation for a Y-strainer?
Install with the screen chamber pointing downward. This allows gravity to collect debris at the bottom. Horizontal or vertical downflow installation is acceptable. Do not install with the chamber pointing upward.
Q: How do I choose the mesh size for a Y-strainer?
Start with the downstream equipment requirement. 20-40 mesh is typical for steam traps, 40-60 mesh for control valves, and 10-20 mesh for centrifugal pumps. Specify the opening in micron, not just mesh count.
Q: What is the pressure drop across a clean Y-strainer?
A clean Y-strainer typically has a pressure drop of 2-5 psi at rated flow, depending on the mesh and open area. The pressure drop rises as the screen blinds.
Q: Does a Y-strainer require a blowdown valve?
A blowdown valve is recommended for dirty fluids and sizes above NPS 2 1/2. It allows cleaning without removing the screen. Clean gas and small lines can be cleaned manually.
Q: Can a Y-strainer be used for steam service?
Yes. Y-strainers are commonly used to protect steam traps. A Dutch weave screen (e.g., 30 x 160) is often preferred for steam because it tolerates higher differential pressure.
Q: What standards does the Y-strainer comply with?
The strainer is designed to ASME B16.34, with face-to-face dimensions to ASME B16.10, flanged ends to ASME B16.5, and testing to API 598.
Q: What is the typical lead time?
Standard lead time is 4-6 weeks depending on size, class, material, and mesh requirement.
Q: Are material certificates provided?
Yes. EN 10204 3.1 material certificates for the body and screen can be provided upon request.
For specific questions regarding your Y-strainer installation or mesh selection, provide the line size, medium, pressure class, and downstream equipment. Our engineering team will confirm the specification.
For more information on API Y-strainers, contact HYRIG: info@hyrig.com