HYRIG can supply the Skid-Mounted Mobile Substation and its spare parts. The Skid-Mounted Mobile Substation is a highly integrated, movable power solution designed for short-term and mobile operations like electric fracturing, featuring rapid deployment and minimal civil construction.
| Parameter | 12.5MVA Model | 15MVA Model | 16MVA Model |
|---|---|---|---|
| On-load Tap Changing | -4×5% to +2×5% | -4×5% to +2×5% | -4×5% to +2×5% |
| Weight (t) | 35 | 36 | 37 |
| Dimensions (mm) | 8500×3000×3000 | 8500×3000×3000 | 8100×3000×3000 |
| No-load Loss | ≤10kW | ≤10kW | ≤10kW |
| Load Loss | ≤68kW | ≤68kW | ≤68kW |
Data source: Technical data table.
| Capacity | Width | Depth | Height | Weight |
|---|---|---|---|---|
| 3150kVA | 7100mm | 3000mm | 2900mm | 22t |
| 12.5MVA | 8500mm | 3000mm | 3000mm | 35t |
| 15MVA | 8500mm | 3000mm | 3000mm | 36t |
| 16MVA | 8100mm | 3000mm | 3000mm | 37t |
The substation integrates a 35kV gas switchgear, station transformer, background monitoring system, UPS, and an oil-immersed power transformer with 10kV outgoing cabinets. All components are mounted on a grooved steel skid. It uses a cable side-in and side-out wiring mode, requiring only a simple foundation (10-15mm steel plate or 300mm cement platform) on site.
When selecting a mobile substation, verify: 1. Capacity: Ensure the MVA rating supports your fracturing or drilling load. 2. Voltage: Confirm the input (e.g., 35kV) and output (e.g., 10kV) match your grid and equipment. 3. Site Conditions: The skid design requires minimal civil work. 4. Mobility: Ensure the dimensions and weight are suitable for transport to your site.
The Skid-Mounted Mobile Substation is suitable for electric fracturing operations and remote drilling sites where rapid deployment and mobility are required.
Disclaimer: This equipment is a heavy-duty industrial electrical device. Install and maintain it in strict accordance with local electrical safety regulations and the manufacturer's instructions; ensure proper grounding, insulation, and overload protection before energizing.
HYRIG provides replacement parts for the Skid-Mounted Mobile Substation, including transformer components, switchgear parts, and monitoring system modules. Contact HYRIG for a specific parts quotation.
Q: What is the production cycle? A: The modular assembly and factory-based construction reduce the production cycle to approximately 3 months. Q: Does it require a concrete foundation? A: No, it only requires simple site leveling and a 10-15mm steel plate or 300mm cement platform. Q: What is the maximum capacity? A: Up to 16MVA. Q: What is the lead time? A: Contact HYRIG for current availability and scheduling.
Need a mobile power solution for your fracturing site? Tell us your required capacity, voltage, and site conditions, and HYRIG engineers will provide the optimal layout. Explore related products: Electric Fracturing Pump System or view the YX Medium Voltage VFD.
For Skid-Mounted Mobile Substation selection and spare parts, contact HYRIG: info@hyrig.com
HYRIG is an oilfield equipment supplier providing electric fracturing pump systems, VFD drives, drilling-rig motors, and skid-mounted mobile substations — from drive systems and inverters to motors and power solutions — to operators and service companies worldwide.
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.