HYRIG offers Sulzer BBS series pump replacements and wear parts, including API 610 centrifugal pumps (BBS, OHH, GSG, ZE) and complete API 682 seal support systems. For technical consultation or quotation, contact: info@hyrig.com.
Sulzer BBS pumps are horizontal single/multi-stage process pumps designed in accordance with API 610 BB2 standards, suitable for medium-pressure applications (P ≤ 60 bar) and compatible with clean to mildly corrosive media. This guide provides standardized API 682 seal piping plan matching for BBS pumps, ensuring seal reliability, cooling efficiency, and leakage control.
Single Seal Priority: Clean, non-hazardous, low-temperature/pressure (T ≤ 80°C, P ≤ 25 bar) → Basic plans (Plan 11/31)
Cooling Required: High-temperature clean media (80°C < T ≤ 177°C) → Cooling plan (Plan 21)
Zero-Emission Demand: Toxic, flammable media or high-pressure (P ≤ 60 bar) → Pressurized dual seal plan (Plan 53A)
Abrasive Media: Low solids content (≤ 2%) → Particle separation plan (Plan 31)
| Item | Description |
|---|---|
| Application Scenarios | Clean, non-polymerizing media (water, oil, weak acids); T ≤ 80°C, P ≤ 25 bar; typical industries: general chemical, water treatment, industrial processes |
| Configuration Details | Flow path: Pump discharge → Orifice plate (≥3 mm) → Seal chamber (12 o'clock injection) Recommended seal: TB1/TS1/SE1 (single-ended, balanced) Key components: Orifice plate (316L), stainless steel piping |
| Maintenance Tips | Monitor orifice blockage via temperature difference (ΔT > 10°C indicates clogging); flush velocity ≥ 1 m/s; inspect piping quarterly for corrosive media |
| Item | Description |
|---|---|
| Application Scenarios | High-temperature clean media (hot water, heat transfer oil); 80°C < T ≤ 177°C, P ≤ 40 bar; typical industries: thermal power, chemical refining, heating systems |
| Configuration Details | Flow path: Pump discharge → Shell-and-tube cooler (cocurrent) → Orifice plate → Seal chamber Recommended seal: TB1F/TS2 (single-ended with built-in flush) Key components: Shell-and-tube cooler (carbon steel shell + copper tubes), temperature gauge |
| Maintenance Tips | Vent cooler at highest point before startup; cooler outlet temperature ≤ 80°C; clean cooler tubes annually to prevent scaling (chemical descaling for hard water) |
| Item | Description |
|---|---|
| Application Scenarios | Toxic, flammable media (solvents, hydrocarbons, aromatics); P ≤ 60 bar, zero-emission requirements; typical industries: petrochemical, pharmaceutical, hazardous waste treatment |
| Configuration Details | Fluid system: Pressurized seal pot (10–14 bar) + Nitrogen blanket Barrier fluid: Glycol, synthetic oil, or media-compatible fluid (avoid reactivity) Recommended seal: TB2P/TS2P/SE2 (double-ended, balanced) Key components: Seal pot (316L/PTFE-lined), pressure relief valve, level gauge |
| Maintenance Tips | Maintain barrier pressure 1.75 bar above process pressure (adjust via nitrogen regulator); monitor seal pot level weekly (sudden drop indicates internal leakage); replace barrier fluid every 6 months (or when contamination detected) |
| Item | Description |
|---|---|
| Application Scenarios | Low-solids media (slurry, wastewater with ≤ 2% solids, suspended particles); T ≤ 80°C, P ≤ 25 bar; typical industries: wastewater treatment, mining, pulp and paper (pre-treatment) |
| Configuration Details | Flow path: Pump discharge → Cyclone separator (removes particles ≥ 2 μm) → Seal chamber Recommended seal: TS2 (SiC/SiC faces, duplex steel metal parts) Key components: Cyclone separator (duplex steel), backflush valve |
| Maintenance Tips | Clean cyclone separator weekly to prevent solids accumulation; use duplex steel piping and components to resist abrasive wear; inspect seal faces monthly (replace if scratches or chipping found) |
| Application Type | API Plan + Seal Model | Expected Operating Life |
|---|---|---|
| General clean media transfer | Plan 11 + TB1/TS1 | 24,000+ hours |
| High-temperature oil circulation | Plan 21 + TB1F | 18,000+ hours |
| Hazardous solvent transfer | Plan 53A + TB2P | 20,000+ hours |
| Low-solids wastewater treatment | Plan 31 + TS2 | 15,000+ hours |
HYRIG provides API 682-compliant seal support systems (orifice plates, coolers, seal pots) and replacement parts (cartridge seals, O-rings, cyclone separators) specifically engineered for Sulzer BBS pumps. All solutions meet API 610 requirements and ensure 25,000+ operating hours. For customized plan design, technical consultation, or quotation, contact:
info@hyrig.com
More Mechanical Seal: