The Upper IBOP 110103-500 is a primary well control device on the VARCO TDS-11SA top drive, used in deep and ultra-deep wells. This manual ball valve isolates the drill string during connections, tripping, and kicks. Learn proper operation and integration with BOP stack.

Conatct For Details
DetailReview(0)Additional

The Role of the Upper IBOP in Deep Drilling Well Control

On a VARCO TDS-11SA top drive, the Upper IBOP 110103-500 is the highest mechanical barrier inside the drill string. In deep and ultra-deep wells, where reservoir pressures are high and margins are narrow, a reliable upper IBOP is essential for safety and environmental protection.

When to Close the Upper IBOP on TDS-11SA

1. Before Breaking a Connection

Whenever the top drive disconnects from the drill pipe, the upper IBOP must be closed. This prevents:

  • Mud spilling onto the rig floor (especially critical offshore)

  • Backflow from the drill string if the float valve fails

  • Loss of hydrostatic head inside the drill pipe

Procedure: Stop circulating → Close upper IBOP → Observe pressure → Break connection.

2. While Tripping Pipe (Deep Wells)

When pulling pipe out of the hole in deep wells:

Float valve present?Upper IBOP position
Yes (operational)Closed as backup only
No (float not used)Must be closed at all times while tripping
Float valve failedClose upper IBOP immediately

3. Upon Detecting a Kick

When the well flows (positive kick indication), the driller must:

  1. Stop rotation and pump.

  2. Close the upper IBOP immediately.

  3. Close the lower IBOP (if installed).

  4. Close annular BOP.

  5. Record shut-in drill pipe pressure (SIDPP) and shut-in casing pressure (SICP).

  6. Prepare for well kill operation (often using Driller’s Method or Wait & Weight).

4. During Well Kill Circulation

When using the TDS-11SA top drive to circulate out a kick:

  • Circulating: Upper IBOP open (drilling mud flows through it)

  • Not circulating (pressure check, etc.): Upper IBOP closed

Operating Sequence for Well Control with TDS-11SA

EventAction
Normal drillingIBOP open
Kick detectedStop pump → Close upper IBOP → Close BOPs
After BOPs closedRecord pressures
Prepare to circulateConfirm IBOP closed, open lower IBOP slowly
Begin kill circulationOpen upper IBOP slowly, start pump
Pause circulationStop pump → Close upper IBOP
Kill complete, well staticPressure test IBOP before opening

Integration with BOP Stack

BarrierPurpose
Upper IBOP 110103-500Stops flow inside drill pipe above top drive
Lower IBOP (114706-500)Stops flow inside drill pipe below top drive
Annular BOPSeals around the drill pipe in annulus
Ram BOPs (pipe & shear)Seal around pipe or cut & seal

Best Practices for TDS-11SA Well Control

  • Test the upper IBOP every 14 days or before each new well section per API 16D.

  • Cycle the valve every shift – ensures it will move when needed.

  • Post a visible procedure at the driller’s console.

  • Train all drill crews – simulate closing IBOP in well control drills.

  • Keep a spare upper IBOP on location for immediate change-out (critical for deep wells).

Common Mistakes to Avoid

  • ❌ Closing IBOP before stopping pump – pressure surge may damage seals.

  • ❌ Forgetting to close IBOP before breaking connection – mud spill and possible well flow.

  • ❌ Using IBOP as a choke – never partially open under pressure; fully open or fully closed only.

  • ❌ Neglecting low-pressure test – small leaks may go undetected until a kick occurs.

Emergency Actions

If Upper IBOP 110103-500 Fails to Close:

  1. Attempt to close it using a cheater bar (controlled force).

  2. If still open, use the lower IBOP if installed.

  3. If no lower IBOP, strip back to BOPs and close annular.

  4. Pump barite plug if necessary.

If Upper IBOP 110103-500 Fails to Open:

  1. Equalize pressure across the valve (if possible).

  2. Use a second T-handle or extension bar.

  3. If still stuck, replace the IBOP at the next connection.

Documentation & Training

We provide:

  • Well control worksheets for IBOP integration with TDS-11SA

  • Quick-reference card for driller’s console

  • API 16D test report templates

Contact for Well Control Advisory

For training materials, emergency support, or spare IBOPs:
Email: info@hyrig.com

*Also available: Lower IBOP 114706-500 for dual barrier isolation, and sour service version 110103-502 for H₂S environments.*