No-load running time cannot exceed 5 seconds. The pump must run filled with liquid slurry; otherwise the mechanical seal may be damaged.
The axes of two pulleys must be parallel and the end surface error cannot exceed 2 mm; belts should be aligned and tightened; the electric motor must be mounted stably.
Use 30# weight motor oil to the middle level of the dipstick. Oil should be changed every 90 days or 1000 hours.
When radial runout exceeds 0.05 mm, the shaft shall be replaced.
No. The suction line should not be throttled; a positive shut-off valve may be installed for pump removal and maintenance.
No. The manual warns that the pump cannot be used on an active mud system because it will shear drill solids and barite, and these solids will damage the pump very quickly.
0.6 mm.
The WJQ5×6J main pump and set drawing part numbers are listed on the XBSY WJQ5×6J parts and exploded view page.
For XBSY WJQ5×6J shear pump questions, contact HYRIG: info@hyrig.com