HYRIG can supply the XBSY WJQ5×6J shear pump range and spare parts. This guide summarizes the installation, operation and maintenance requirements from the manual.
Installation
- Locate the pump near the liquid source so the suction line can be short and losses reduced.
- The foundation should be sufficiently rigid and substantial to absorb vibration and support the base plate at all points.
- The base plate should be installed in a level position.
- For pulley installation, the axes of two pulleys must be parallel and the end surface error cannot exceed 2 mm; belts should be aligned and tightened; the electric motor must be mounted stably.
- The suction line should be equal to or larger than the pump suction.
- The suction line should not be throttled; a positive shut-off valve may be installed for pump removal and maintenance.
- The suction line should eliminate air pockets and slope gradually downward to the supply source.
- The suction line should have a straight section into the pump of at least two times its diameter.
- For temporary flexible hose, use a non-collapsing hose.
- A positive shut-off valve should be located in the discharge pipe.
- All pipes should be independently supported and accurately aligned; the pump must not support pipe weight.
- If operating conditions are not known accurately, provide a throttle valve in the discharge line.
- If connected to a pressurized system, install a check valve between the discharge and throttling valve to prevent back flow.
Operation
Preparation:
- Pump rotates freely by hand.
- Check the pump rotation direction; the correct direction is shown by an arrow on the casing.
- Open the suction valve fully.
- Fill the pump and suction line with fluid to vent air.
Running:
- Start the motor after completing all preparations.
Lubrication:
- Add a good grade of 30# weight motor oil until the middle level of the dipstick. Do not overfill.
- Oil should be changed every 90 days or 1000 hours.
- Under special conditions, a grease that can dissolve with the motor oil may be selected for lubrication.
Maintenance and Inspection
- The pump employs mechanical seal as its primary seal and packing seal as its secondary seal. Packing seal can be compacted only when the mechanical seal is disabled; otherwise the seal may be damaged.
- No-load running time cannot exceed 5 seconds. The pump must run filled with liquid slurry; otherwise the mechanical seal may be damaged.
- Impeller: replace if excessive erosion, corrosion, extreme wear, or vane breakage.
- Shaft: replace if run-out exceeds 0.05 mm; bearing seats and oil seal area must be smooth and free of scratches or grooves.
- Shaft sleeve: replace if grooved.
- Oil seal: removed oil seal must be replaced.
- Ball bearings: replace if worn, loose, or rough and noisy when rotated.
- O-rings and gaskets: recommended to remove and replace during disassembly; reuse only if not worn or damaged.
- During assembly, the clearance between the back of the impeller and the protecting plate is 0.6 mm.
- Packing gland should be tightened finger tight only; over-tightening may burn the packing when the pump is started.
Troubleshooting
| Fault | Cause | Troubleshooting |
|---|
| Excessive shaft power | Impeller friction; pump works below designed head; packing over-tightened; belt slips | Adjust clearances; check complete machine; readjust gland; re-tighten belts |
| Fall in head and capacity | Blocked suction/impeller; speed drop; worn impeller; excessive clearance; inlet valve too small | Remove blockage; run at rated speed; replace impeller; adjust impeller; increase opening |
| Bearing overheat | Too much/little lubricant; impurities in lubricant; worn bearing | Keep oil level; change lubricant; replace bearing |
| Vibration and noise | Unbalanced impeller; worn bearing; loose connection; cavitation | Replace impeller; replace bearing; tighten parts; improve suction condition |
| Excessive leakage when stopping | Over-worn seal; extremely worn shaft sleeve; extremely worn packing | Renew seal; replace sleeve; renew packing |
Data source: Shear Pump Directions For Installation And Operation, Table 3.