HYRIG can supply the Z63Y series welded connection mud gate valve range and its replacement parts. The Z63Y-78-105 is a manual, rising-stem gate valve with a 3" (DN78) bore, engineered for ultra-high-pressure abrasive drilling mud service at pressures up to 15,000 psi (105 MPa). It features weld-end connections and a precision-lapped metal-to-metal (hard) seal for permanent manifold integration.
| Model Number | Nominal Diameter | Working Pressure | L (Length) | H (Height) | A (Width) |
|---|---|---|---|---|---|
| Z63Y-78-105 | 78 mm (3") | 105 MPa (15,000 psi) | 381 mm | 698 mm | 125 mm |
Data source: Technical data table.
Explore the full Z63Y Welded Mud Valve Series.
The exact footprint for the ultra-high-pressure Z63Y-78-105 is:
These dimensions are critical for replacing existing welded valves. Verify your current pipe cut-out length before ordering.
The Z63Y series utilizes a parallel metal-to-metal sealing design (indicated by the "Y"). The solid slab gate is sandwiched between two floating seat rings. Engineered for 15,000 psi, the body and stem of the Z63Y-78-105 are heavily reinforced to ensure structural integrity under extreme pressure spikes. Hard-facing on the seats provides drop-in reliability in abrasive mud.
Replacing an older ultra-high-pressure welded mud valve? Here is what to verify:
The Z63Y-78-105 is specifically suited for:
Disclaimer: This equipment is designed for high-pressure industrial applications. Ensure strict compliance with local safety standards and verify pressure ratings prior to installation.
Not sure if the 15,000 psi rating is required? Tell us your manifold working pressure, and our engineers will match the correct Z63Y model.
We supply replacement parts for the Z63Y series, including gate and seat assemblies, stem packing kits, and handwheels. See our Z63Y Welded Mud Valve Parts page for compatible repair kits.
Q: What is the maximum pressure for the Z63Y-78-105?
A: The maximum working pressure is 105 MPa (15,000 psi).
Q: What is the face-to-face length of this valve?
A: The overall length (L) is 381 mm.
Q: Does this valve use metal-to-metal sealing?
A: Yes. The "Y" in Z63Y indicates a hard metal-to-metal seal.
Q: What is the typical lead time?
A: Standard lead time is 25-30 days due to the ultra-high-pressure rating. Contact us for expedited options.
For Z63Y-78-105 welded mud gate valve selection and replacement parts, contact HYRIG: info@hyrig.com
Page last updated: 2026-11-08
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.