The 110103-500 upper inner blowout preventer (IBOP) is a critical well control device for Varco top drives. It isolates the drill string bore, preventing flow from below when the top drive is disconnected. Manual ball valve, 5,000 psi rating. Used during connections, tripping, and kick circulation.

Conatct For Details
DetailReview(0)Additional

The Role of an Upper IBOP in Well Control

The 110103-500 is not just a valve – it is a safety barrier inside the drill string. Mounted directly above the top drive, this inner blowout preventer gives the driller the ability to close the drill string bore instantly, preventing uncontrolled flow of formation fluids or drilling mud up through the top drive.

When Do You Need to Close the Upper IBOP?

1. During Connections (Making or Breaking Singles)

When the top drive is disconnected from the drill pipe, the upper IBOP is closed to prevent mud from spilling onto the rig floor and to stop any backflow from the string.

2. While Tripping Pipe

During trips out of the hole, if the drill string contains a float valve, the IBOP provides an additional mechanical closure. If no float is present, the IBOP is essential to contain wellbore pressure.

3. When a Kick Occurs

Upon detecting a kick (influx of formation fluid), the driller closes both upper and lower IBOPs before initiating well kill procedures. The closed IBOPs trap the pressure inside the drill pipe.

4. Circulating Out a Kick Using the Top Drive

In some well control methods, the top drive is used to circulate. The upper IBOP remains closed when not circulating, ensuring that well pressure cannot travel up through the top drive system.

Why the 110103-500 is Trusted for Well Control

  • Positive mechanical seal – ball valve design ensures no leakage when closed under pressure

  • Manual operation – no hydraulic or electric control to fail; the driller operates it directly

  • Full bore (3-1/4") – does not restrict tool or logging string passage when open

  • Field-proven reliability – used on thousands of rigs worldwide

Recommended Well Control Practices with 110103-500

OperationUpper IBOP Position
Normal drilling (circulating)Open
Before breaking connectionClosed
Tripping out with floatClosed as backup
Tripping out without floatClosed
After closing annular BOPClose IBOP
Well kill circulationOpen only when pumping

Maintenance for Well Control Readiness

  • Pressure test every 14 days or before each new well section

  • After any well control event, disassemble and inspect the IBOP

  • Keep a spare 110103-500 on the rig floor for immediate change-out

Training Note

All drill crews must be familiar with the operation of the 110103-500. The T-handle must be clearly marked for open/close direction (clockwise close).

Contact for Well Control Advisory

For technical bulletins, maintenance checklists, or emergency spares:
Email: info@hyrig.com

*We also supply the lower IBOP 114706-500 for dual barrier isolation.*