On a VARCO TDS-11SA top drive drilling in sour gas wells, the 110103-502 Upper IBOP is more than a barrier – it is a critical safety device that must remain functional despite exposure to hydrogen sulfide (H₂S). Standard IBOPs (110103-500) will fail prematurely in H₂S due to sulfide stress cracking and seal degradation.
| Feature | Benefit |
|---|---|
| NACE MR0175 alloy | Resists sulfide stress cracking (SSC) |
| HNBR seals | Withstands H₂S without swelling or hardening |
| Corrosion-resistant ball | Maintains smooth operation in acidic fluids |
When a kick is detected in a sour gas well, speed and safety are paramount. The driller must close the upper IBOP immediately while protecting personnel from H₂S release.
Increase in H₂S monitor readings at flowline or shakers
Pit gain with characteristic rotten egg smell (use monitors, not nose)
Change in mud properties (pH drop, increased viscosity)
| Step | Action |
|---|---|
| 1 | Activate rig H₂S alarm |
| 2 | Don breathing apparatus (if not already) |
| 3 | Stop rotation and pump |
| 4 | Close upper IBOP 110103-502 |
| 5 | Close lower IBOP (if installed) |
| 6 | Close annular BOP |
| 7 | Verify closure – pressure should stabilize |
| 8 | Evacuate non-essential personnel upwind |
Record SIDPP and SICP (shut-in pressures)
Do not attempt to circulate immediately – H₂S may be in the annulus
Consider pumping a barite pill to kill the well before circulating if H₂S concentration is high
If circulating is required, use H₂S scavenger in mud
| Event | Action |
|---|---|
| Normal drilling (sour gas expected) | IBOP open, H₂S monitors active |
| Kick detected (H₂S present) | Stop pump → Close 110103-502 → Close BOPs |
| After BOPs closed | Evacuate, record pressures |
| Determine if H₂S is in annulus | Monitor casing pressure, H₂S sensors |
| If H₂S confirmed in annulus | Pump kill fluid with scavenger, do not circulate to surface |
| Kill well | Bullhead if possible, or reverse circulate with scavenger |
After any H₂S exposure, the 110103-502 must be:
Removed and decontaminated.
Inspected for sulfide stress cracking (dye penetrant or MPI).
Disassembled and HNBR seals replaced (even if visually OK).
Ball and seats inspected for pitting.
Pressure tested before re-use.
❌ Using standard IBOP (110103-500) in H₂S well – risk of catastrophic failure.
❌ Delaying IBOP closure to observe kick – H₂S can reach surface in minutes.
❌ Opening IBOP without verifying pressure equalization – could release H₂S to rig floor.
❌ Reusing seals after H₂S exposure – HNBR has limited life, replace.
If the 110103-502 fails and H₂S escapes to the rig floor:
Activate emergency shutdown.
All personnel don breathing apparatus.
Evacuate to safe briefing area upwind.
Close BOP shear rams if necessary.
Call for well control specialist.
We provide:
NACE MR0175 compliance certificates
H₂S well control worksheets
IBOP inspection log for sour service
For training materials, H₂S-specific IBOP procedures, or spare 110103-502 units:
Email: info@hyrig.com
*Also available: Lower IBOP 114706-502 for dual sour service isolation.*
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.