The 9703320000 Lower IBOP is manufactured to Beijing Petroleum Machinery (BPM) specifications for the DQ50BSC top drive system. Beijing Petroleum Machinery Factory is a leading Chinese manufacturer of top drive systems, with its DQ series widely used in domestic and international drilling operations. The DQ50BSC is a medium-to-heavy duty top drive suitable for deep drilling applications.
As a secondary inner blowout preventer, the 9703320000 installs below the top drive, between the upper IBOP and the drill string. This manual ball valve provides a second mechanical barrier inside the drill string. In standard top drive configuration, the connection order is: top drive spindle → upper IBOP → lower IBOP → saver sub → drill string. The lower IBOP is manually operated using a specialized wrench or T-handle, giving the driller a reliable backup shut-off option independent of hydraulic systems.
Direct fit for BPM DQ50BSC top drive
Manual ball valve design (independent of hydraulic or electrical control)
Working pressure: 5,000 psi (34.5 MPa) standard configuration
Full bore design – minimizes flow restriction for wireline tools
Material: High-strength alloy steel forging
Seals: Standard NBR for conventional service
Operation: Manual wrench or T-handle (clockwise close)
API compliance: API Spec 7, API Spec 7K, API Spec 8C, API Q1
Redundant barrier – if upper IBOP leaks or fails mechanically, lower IBOP provides backup
Manual operation – not dependent on hydraulic or electrical power; can be operated under any rig condition
Upper IBOP maintenance – enables safe removal and servicing of upper IBOP while drill string remains under pressure
Pressure equalization – can be used to equalize pressure across the upper IBOP before opening
Field-proven design – widely used in BPM top drive installations
| Position | Part Number | Operation | Primary Role |
|---|---|---|---|
| Upper IBOP | 9703340000 | Hydraulic (PLC controlled) | Primary barrier, closes before breaking connection |
| Lower IBOP | 9703320000 | Manual (wrench) | Secondary barrier, backup for well control |
Deep wells up to 5,000m
Onshore and offshore drilling
Workover and completion operations
Non-sour environments (standard NBR version)
For pricing, availability, and technical datasheets: info@hyrig.com
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.