9703340000 Upper IBOP for BPM DQ50BSC – Well Control & Safety

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
The 9703340000 Upper IBOP is a primary well control device on the BPM DQ50BSC top drive. This manual ball valve isolates the drill string during connections, tripping, and kicks. Learn proper operation, when to close it, and integration with BOP stack.

Conatct For Details
DetailReview(0)Additional

The Role of the Upper IBOP in Well Control

On a BPM DQ50BSC top drive, the 9703340000 Upper IBOP is the primary mechanical barrier inside the drill string. Together with the lower IBOP (if installed) and the BOP stack, it forms a complete pressure containment system.

The BPM top drive series, including the DQ50BSC, has been widely adopted in domestic and international drilling operations. Its design and parameters are similar to international top drives such as Varco TDS series.

When to Close the Upper IBOP on DQ50BSC

1. Before Breaking a Connection

Whenever the top drive disconnects from the drill pipe, the upper IBOP must be closed. This prevents:

  • Mud spilling onto the rig floor

  • Backflow from the drill string if the float valve fails

  • Loss of hydrostatic head inside the drill pipe

Procedure: Stop circulating → Close upper IBOP → Observe pressure → Break connection.

2. While Tripping Pipe

When pulling pipe out of the hole:

Float valve present?Upper IBOP position
Yes (operational)Closed as backup only
No (float not used)Must be closed at all times while tripping
Float valve failedClose upper IBOP immediately

3. Upon Detecting a Kick

When the well flows (positive kick indication), the driller must:

  1. Stop rotation and pump.

  2. Close the upper IBOP immediately.

  3. Close the lower IBOP (if installed).

  4. Close annular BOP.

  5. Record shut-in drill pipe pressure (SIDPP) and shut-in casing pressure (SICP).

  6. Prepare for well kill operation.

4. During Well Kill Circulation

When using the DQ50BSC top drive to circulate out a kick:

  • Circulating: Upper IBOP open (drilling mud flows through it)

  • Not circulating (pressure check, etc.): Upper IBOP closed

Operating Sequence for Well Control with DQ50BSC

EventAction
Normal drillingIBOP open
Kick detectedStop pump → Close upper IBOP → Close BOPs
After BOPs closedRecord pressures
Prepare to circulateConfirm IBOP closed, open lower IBOP slowly
Begin kill circulationOpen upper IBOP slowly, start pump
Pause circulationStop pump → Close upper IBOP
Kill complete, well staticPressure test IBOP before opening

Integration with BOP Stack

BarrierPurpose
Upper IBOP 9703340000Stops flow inside drill pipe above top drive
Lower IBOPStops flow inside drill pipe below top drive
Annular BOPSeals around the drill pipe in annulus
Ram BOPsShear or seal around pipe / close open hole

Best Practices for DQ50BSC Well Control

  • Test the upper IBOP every 14 days or before each new well section per API 16D.

  • Cycle the valve every shift – ensures it will move when needed.

  • Post a visible procedure at the driller’s console.

  • Train all drill crews – simulate closing IBOP in well control drills.

  • Keep a spare upper IBOP on location for immediate change-out.

Common Mistakes to Avoid

  • Closing IBOP before stopping pump – pressure surge may damage seals.

  • Forgetting to close IBOP before breaking connection – mud spill and possible well flow.

  • Using IBOP as a choke – never partially open under pressure; fully open or fully closed only.

  • Neglecting low-pressure test – small leaks may go undetected.

Emergency Actions

If Upper IBOP 9703340000 Fails to Close:

  1. Attempt to close it using a cheater bar (controlled force).

  2. If still open, use the lower IBOP if installed.

  3. If no lower IBOP, strip back to BOPs and close annular.

  4. Pump barite plug if necessary.

If Upper IBOP 9703340000 Fails to Open:

  1. Equalize pressure across the valve (if possible).

  2. Use a second T-handle or extension bar.

  3. If still stuck, replace the IBOP at the next connection.

Documentation & Training

We provide:

  • Well control worksheets for IBOP integration with BPM DQ50BSC

  • Quick-reference card for driller’s console

  • API 16D test report templates

Contact for Well Control Advisory

For training materials, emergency support, or spare IBOPs: info@hyrig.com

Also available: Lower IBOP and other BPM DQ50BSC top drive spare parts.


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit