9703340000 Upper IBOP for BPM DQ50BSC – Installation & Maintenance Guide

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
Installation and maintenance instructions for 9703340000 Upper IBOP on BPM DQ50BSC top drive. Thread preparation, torque requirements, pressure testing per API 16D, seal replacement schedule, troubleshooting for reliable well control.

Conatct For Details
DetailReview(0)Additional

Proper Installation Procedure

Correct installation of the 9703340000 Upper IBOP on a BPM DQ50BSC top drive ensures reliable well control. BPM top drives are known for their advanced AC variable frequency drive technology, precise torque and speed control, and integration with Siemens electrical systems.

Before Installation

  1. Inspect the IBOP – Check for shipping damage, clean all surfaces.

  2. Verify threads – Confirm top connection matches DQ50BSC spindle.

  3. Check seal condition – Ensure NBR seals are not cracked or hardened.

  4. Prepare thread compound – Use API 7-1 approved thread lubricant.

Installation Steps

StepAction
1Apply thread compound evenly to both the IBOP top threads and DQ50BSC spindle threads.
2Hand-thread the IBOP onto the spindle until finger tight.
3Tighten to factory-specified torque using appropriate tools.
4Attach the T-handle and verify smooth operation.
5Connect the bottom string to the lower thread (use same compound).

Pressure Testing After Installation

Per API 16D, perform these tests before drilling:

  1. Low-pressure test: Close the IBOP and apply 500 psi from below. Hold 5 minutes. No visible leakage.

  2. High-pressure test: Apply 5,000 psi from below. Hold 5 minutes. No pressure drop.

  3. Shell test (optional): Open the IBOP, apply 7,500 psi to the body. No leakage.

Maintenance Schedule

IntervalAction
Daily / each tourCycle the valve fully open and closed. Check for smooth operation.
WeeklyVisual inspection for damage or corrosion.
Per API 16D (14 days)Pressure test (low and high). Record results.
After 300 cycles or 6 monthsReplace seals (repair kit). Inspect ball and seats.
After a well control eventDisassemble, inspect, replace seals regardless of cycle count.

Seal Replacement (Repair Kit)

The 9703340000 uses a standard NBR seal kit. Replacement procedure:

  1. Remove IBOP from top drive.

  2. Unscrew end pieces (use proper tools).

  3. Extract ball, seats, and seals.

  4. Clean all components with solvent.

  5. Install new seals (lubricate with silicone grease).

  6. Reassemble and torque end pieces to specification.

  7. Pressure test before returning to service.

Repair kit part number: Contact info@hyrig.com for kit details.

Troubleshooting for BPM DQ50BSC

ProblemPossible CauseSolution
Hard to turnMud residue insideFlush with clean fluid, lubricate
Hard to turnDifferential pressure too highEqualize pressure before operating
Leaks when closedWorn seat or ballReplace seals, inspect ball
Thread gallingInsufficient thread compoundClean threads, reapply compound
Cannot close fullyDebris in ball cavityRemove IBOP, disassemble and clean

Safety Notes

  • Always verify zero pressure before removing the IBOP.

  • Use proper lifting equipment.

  • Wear gloves when handling thread compound.

  • Never use pipe wrenches on the IBOP body – use the T-handle only.

Contact for Maintenance Support

For repair kits, special tools, or field service assistance: info@hyrig.com


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit