Amine pumps are critical rotating equipment in natural gas sweetening (amine treating), refinery hydrodesulfurization (HDS), Claus tail gas treatment, and carbon capture (CCUS) processes. They handle alkanolamine solutions – primarily MDEA (methyldiethanolamine), MEA (monoethanolamine), and DEA (diethanolamine) – in two key forms:
Lean amine: Regenerated amine stripped of H₂S and CO₂, ready to be re‑circulated to the absorber.
Rich amine: Amine loaded with acid gases (H₂S/CO₂), en route from absorber to regenerator.
All pumps in this series are fully manufactured and certified to API 610 11th/12th edition (ISO 13709) standards, ensuring a minimum 3‑year uninterrupted operation and a 20‑year design life. The series includes all necessary pump types for a complete amine unit: circulation pumps, charge pumps, transfer pumps, reflux pumps, and sump pumps.
Based on duty, head, flow, and installation, three API 610 pump types are available.
| API 610 Type | Configuration | Amine Pump Duties |
|---|---|---|
| OH2 | Overhung, centerline-mounted, single-stage | Lean amine circulation, rich amine transfer, reflux pump, booster duty, tank transfer |
| BB3 | Axially split, single casing, multistage, between bearings | High‑head lean amine charge (for high‑pressure absorbers), high‑pressure rich amine transfer |
| VS4 | Vertical suspended sump/can type | Amine sump evacuation, drain pit collection, tank transfer with low NPSHa |
Transports regenerated lean amine from the stripper bottom to the high‑pressure absorber.
Typical configuration: OH2 (single‑stage) for most duties; BB3 for very high head (>260 m)
Flow: 30 – 600 m³/h
Head: 50 – 260 m (OH2); up to 1500 m (BB3)
Materials: 316L SS (S‑8) standard
Pumps loaded amine from the absorber bottom to the regenerator.
Typical configuration: OH2 (single‑stage)
Flow: 30 – 600 m³/h
Head: 40 – 150 m
Materials: 316L SS (S‑8) with NACE MR0175 for H₂S
Feeds lean amine into the absorber when operating pressure exceeds the circulation pump discharge head. Commonly a BB3 multistage pump.
Typical configuration: BB3 (axially split, multistage)
Flow: 50 – 1000 m³/h
Head: 260 – 1500 m
Pressure: Up to 150 bar
Materials: 316L SS (S‑8) or duplex (D‑1/D‑2)
Returns condensed overhead liquid (water + amine + hydrocarbons) to the top of the regenerator column.
Typical configuration: OH2 (single‑stage)
Flow: 10 – 400 m³/h
Head: 30 – 150 m
Materials: 316L SS (S‑8)
Moves amine between storage tanks, from tank farm to process, or from process back to storage.
Typical configuration: OH2 (single‑stage) or VS4 (vertical for low NPSHa)
Flow: 10 – 500 m³/h
Head: 20 – 100 m
Materials: 316L SS (S‑8)
Collects and transfers amine spills, drain liquids, and leakage from sumps, pits, and collection basins.
Typical configuration: VS4 (vertical suspended, wet pit)
Flow: 10 – 400 m³/h
Head: 20 – 120 m
Materials: 316L SS (S‑8) with suction strainer
| Parameter | OH2 | BB3 | VS4 |
|---|---|---|---|
| Flow range | 10 – 600 m³/h | 50 – 1500 m³/h | 10 – 750 m³/h |
| Head range | 20 – 260 m | 100 – 1500 m | 15 – 280 m |
| Pressure rating | Up to 64 bar | Up to 150 bar | Up to 40 bar |
| Temperature | –45 to +200°C | –45 to +200°C | –46 to +260°C |
| Stages | 1 | 3 – 14 | 1 – 8 |
Amine service requires corrosion‑resistant materials. 316L stainless steel (API 610 Class S‑8) is the industry standard.
| Component | Material (Standard) | Upgrade Option |
|---|---|---|
| Casing | 316L SS (CF3M) | Duplex (D‑1/D‑2), Super Duplex |
| Impeller | 316L SS | Duplex, Super Duplex |
| Shaft | 316 SS or 4140 with coating | 17‑4 PH, Duplex |
| Wear rings | 316L SS + Stellite hard‑facing | Tungsten carbide |
| Gaskets | Spiral wound (graphite) | PTFE |
For sour amine (rich amine with H₂S partial pressure exceeding NACE limits), NACE MR0175 / ISO 15156 compliance is required. Carbon steel (C‑6) is not recommended for any wetted amine service.
Rich amine contains toxic H₂S. Lean amine may contain residual H₂S. Dual pressurised seals are strongly recommended.
| Seal Arrangement | API 682 Plan | Application |
|---|---|---|
| Dual pressurised (Arrangement 3) | Plan 53B (bladder accumulator) | All rich amine and lean amine with H₂S – zero emissions |
| Tandem seal (Arrangement 2) | Plan 52 | Lean amine only, lower H₂S risk |
| Single seal (Arrangement 1) | Plan 11 / 21 | Only for non‑H₂S, low‑pressure lean amine (rare) |
Plan 53B provides barrier fluid pressurised above process pressure, eliminating any amine leakage to atmosphere. It includes a reservoir with level indicator, low‑pressure alarm, and bladder accumulator (no nitrogen entrainment).
Seal faces: Silicon carbide (SiC) / SiC. Elastomers: FKM (Viton) for moderate temperatures; Aflas for high‑temperature amine.
Amine pumps often take suction from:
Atmospheric storage tanks (NPSHa 2–5 m)
Reflux drums (low NPSHa)
Sump pits (very low NPSHa)
To ensure cavitation‑free operation:
Select pump with low NPSHr (optimised first‑stage impeller, large suction eye)
Consider inducer option for NPSHa < NPSHr + 1.0 m
Do not assume subcooling – amine contains dissolved gases (H₂S, CO₂, methane). Calculate NPSHa at bubble point.
All amine pumps must be protected against operation below Minimum Continuous Stable Flow (MCSF). An automatic recirculation valve (ARC) or continuous bypass line with orifice ensures minimum flow returns to the suction source (tank, drum, or sump). This is especially critical for BB3 multistage pumps.
| Application | Fluid | Typical Pumps |
|---|---|---|
| Natural gas sweetening | MDEA / MEA | Lean circulation (OH2), rich transfer (OH2), reflux (OH2) |
| Refinery HDS | MDEA / DEA | Lean charge (BB3), rich transfer (OH2) |
| Claus tail gas treatment | MDEA / DIPA | Lean circulation, rich transfer |
| CCUS (carbon capture) | MEA | Lean circulation, rich transfer, reflux |
| Amine storage & handling | MDEA / MEA / DEA | Transfer pumps (OH2 or VS4), sump pumps (VS4) |
Design life: 20 years minimum
Continuous operation: Minimum 3 years uninterrupted service
Bearing life: L10 ≥25,000 hours
Critical speed: ≥120% of maximum operating speed
Centerline mounting (OH2/BB3): Thermal stability for hot amine (up to 200°C)
Hydrostatic testing: 1.5x design pressure
Performance testing: Water per API 610 Grade 1 or 2
Material certification: EN 10204 3.1 full traceability
NACE MR0175 / ISO 15156 available for sour service
Complete API 610 series – OH2, BB3, VS4 covering every amine pump duty in a gas plant or refinery
316L stainless steel (S‑8) as standard – field‑proven corrosion resistance for all amine services, including sour amine
API 682 Plan 53B dual pressurised seals – zero emissions, mandatory for H₂S‑containing rich amine
Broad hydraulic coverage – flows 10–1500 m³/h, heads 20–1500 m
Low NPSH designs – inducer option for challenging suction conditions
Centreline mounting – maintains alignment for hot amine (up to 200°C)
Back pull‑out (OH2) / axial split (BB3) / vertical withdrawable (VS4) – easy maintenance, reduced downtime
Minimum flow protection – ARC or bypass integrated
NACE MR0175 / ISO 15156 compliant options – for sour amine with H₂S
Field proven – thousands of API 610 amine pumps operating in gas processing, refineries, and CCUS plants worldwide
| Component | Recommended Quantity |
|---|---|
| Mechanical seal cartridge (API 682 Plan 53B ready) | 1 set |
| Bearing set (radial + thrust) | 1 set |
| Wear ring set (casing + impeller) | 1 set |
| Gasket / O-ring kit (full set) | 1 set |
| Inducer (if fitted) | 1 set |
For a complete amine pump package selection – including lean amine circulation, rich amine transfer, amine charge (high‑head), regenerator reflux, and sump evacuation – please contact our engineering team. We provide hydraulic sizing, material selection per API 610 Table H based on your amine composition (MDEA/MEA/DEA, H₂S and CO₂ loading, chloride content), NACE MR0175 certification, API 682 seal plan determination (Plan 53B for rich amine), and complete API 610 data sheets.
Email: info@hyrig.com
Our engineers support natural gas sweetening, refinery HDS, carbon capture, and amine regeneration projects worldwide with reliable, emissions‑compliant API 610 amine pumps – from lean amine circulation to rich amine containment.