HYRIG can supply API butt weld end valves. This FAQ addresses common engineering and procurement questions regarding bore matching, bevel geometry, and field welding compatibility.
Q: What is the difference between a butt weld end and a socket weld end?
A butt weld end joins the valve to the pipe with a full-penetration groove weld. A socket weld end inserts the pipe into a recessed socket and uses a fillet weld, which leaves an internal crevice and is generally limited to NPS 2 and smaller.
Q: What is the purpose of the 1.6 mm root face on the bevel?
The 1.6 mm root face (land) prevents burn-through during the root pass of the weld. It also helps ensure proper fusion at the root of the joint.
Q: Can you supply the valve with a custom bore size?
Yes. The machined inside diameter (C dimension) can be adjusted to match a specific pipe ID or wall thickness. Provide the exact pipe dimensions in the RFQ.
Q: What NDT methods are used for the field weld?
Radiographic Testing (RT) or Phased Array Ultrasonic Testing (PAUT) are standard for full-penetration butt welds. The method and inspection percentage are defined by the project's piping specification.
Q: Does the valve require post-weld heat treatment (PWHT)?
PWHT is generally determined by the pipe material, wall thickness, and the governing piping code (e.g., ASME B31.3). If PWHT is required, ensure the valve's internal trim and seat materials can withstand the elevated temperatures.
Q: How do I check if the valve bore matches the pipe ID?
Provide the pipe Outside Diameter (OD) and Wall Thickness to the manufacturer. The factory will machine the bore to match the calculated Inside Diameter (ID).
Q: What is the typical lead time for these valves?
Standard lead time is 4 to 6 weeks depending on the valve type, material, and documentation requirements. Expedited production may be available for critical maintenance.
Q: Are material certificates provided?
Yes. EN 10204 3.1 material certificates for the body, bonnet, and trim can be provided upon request.
For specific questions regarding your welding procedure or piping specification, provide the pipe Schedule, material, and NDT requirements. Our engineering team will confirm the valve end preparation.
For more information on API butt weld end valves, contact HYRIG: info@hyrig.com