HYRIG can supply API butt weld end valves. Because the valve bore must match the adjoining pipe Schedule and the joint requires specific welding and NDT procedures, the initial Request for Quotation (RFQ) must include precise dimensional and testing data.
To receive an accurate quote and ensure the valve fits the pipeline, provide the following data in your RFQ:
| Data Field | Why It Is Needed |
|---|---|
| Pipe Outside Diameter (OD) | Confirms the valve end OD matches the pipe. |
| Pipe Wall Thickness / Schedule | Determines the bore ID (C dimension) to prevent a weld root step. |
| Pipe Material | Ensures valve body material is compatible to avoid dissimilar metal issues. |
| Design Pressure & Temperature | Defines the valve pressure class (e.g., Class 150, 300, 600). |
| Valve Type | Specifies body construction (e.g., ball, gate, globe, check). |
| NDT Requirement | Defines if RT or PAUT is required for the field weld. |
| PWHT Requirement | Indicates if post-weld heat treatment is needed (affects trim material). |
| Dimension | Standard |
|---|---|
| Bevel Geometry | ASME B16.25 |
| Face-to-Face | ASME B16.10 |
| Pipe Dimensions | ASME B36.10M |
When quoting a butt weld end valve, the most common error is specifying the valve by NPS without specifying the pipe Schedule. A 6-inch valve with a Schedule 40 bore has a different internal diameter than a 6-inch valve with a Schedule 80 bore.
If the valve bore does not match the pipe ID, the welding contractor will face a mismatch at the root. This creates a step, which can cause turbulence, erosion, or fail radiographic acceptance. Providing the pipe OD, wall thickness, and material ensures the factory can machine the bore to match (Dimension C).
When preparing an RFQ for a replacement valve:
Disclaimer: This equipment is designed for high-pressure industrial applications. Welding procedures and NDT requirements are project-specific. Verify pressure ratings and joint integrity requirements prior to installation.
Q: What happens if the valve bore doesn't match the pipe ID?
A mismatch creates a step at the weld root, causing turbulence, erosion, and potential failure during RT or PAUT inspection. The valve must be machined to match the pipe ID.
Q: Do you provide WPS and PQR for field welding?
The manufacturing partner can provide standard WPS/PQR documentation for reference. However, the field welding contractor is typically responsible for ensuring the procedure complies with the project piping specification.
Q: What is the typical lead time for a butt weld end valve?
Standard lead time is 4 to 6 weeks depending on the valve type, size, and NDT/documentation requirements.
To ensure the valve matches your pipeline, provide the pipe OD, wall thickness, and material. Our engineering team will confirm the machined bore (C dimension) and bevel geometry.
For API butt weld end valve RFQ support, contact HYRIG: info@hyrig.com