| Series | Type | Key Feature | Application |
|---|---|---|---|
| 141 | Double Plug Head | Allows sequential release of top and bottom plugs | Standard casing cementing |
| 142 | Single Plug Head | Compact design for single plug operations | Limited space or simple jobs |
| 140 | Drilling Pipe Head | Used for inner-string or drill pipe cementing | Liner cementing / Stab-in |
| 143 | Circulating Sub | Used to establish circulation before cementing | General cementing operations |
Data source: Technical data table.
The cementing head must be rated to match the maximum pressure of the cementing pumps and the casing string.
| Series | Working Pressure | Connection Size | Manifold Type |
|---|---|---|---|
| 141 / 142 / 140 | Verify with specific model | API Threads (Various) | Single or Dual Manifold |
Specific dimensions, weight, and pressure ratings are confirmed against the selected casing and pumping requirements at order.
The cementing head is a manifold that directs cement slurry from the surface pumps into the casing.
Selecting the right cementing head for your operation:
Disclaimer: This equipment is designed for high-pressure industrial applications. Ensure strict compliance with local safety standards and verify pressure ratings prior to installation.
Need help configuring the manifold and plug release mechanism for your rig? Send us your casing size and pump pressure requirements, and we will recommend the appropriate head configuration.
Q: What is the difference between a single plug and a double plug cementing head?
A: A single plug head (142) releases only one plug (usually a top plug). A double plug head (141) holds both a bottom plug (to run ahead of the cement) and a top plug (to displace the cement), allowing for a more standard and controlled cementing operation.
Q: What is the 140 Series used for?
A: The 140 Series is a drilling pipe cementing head, typically used for liner cementing or stab-in operations where the cement is pumped through a drill pipe string.
Q: Can the cementing head be used for high-pressure operations?
A: Yes, the manifolds and bodies are constructed to withstand the high pressures encountered during cementing. Verify the specific pressure rating for your chosen model.
Q: What is the lead time?
A: Standard lead time for cementing heads is 4-6 weeks. Contact us for urgent orders.
For cementing head series selection and support, contact HYRIG: info@hyrig.com