Rupture Disc Float Collar | Horizontal Well Casing Floating

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
HYRIG can supply the rupture disc float collar (PJG-A series) for horizontal well and extended reach well casing floating operations. This specialized tool acts as a temporary blind plate, allowing th
Conatct For Details
DetailReview(0)Additional

Key Facts

  • Tool Type: Rupture Disc Float Collar (Float Coupling)
  • Application: Horizontal, extended reach, and highly deviated wells
  • Function: Reduces casing running friction by allowing air/light fluid filling
  • Shear Pressure: 20-50 MPa (adjustable on site)
  • Material: Non-metallic blind plate (ruptures into fine powder)
  • Operation: Simple pressure build-up to break the disc

Rupture Disc Float Collar Specifications

ParameterValue
ModelPJG-A139.7 (Example size)
Max OD178 mm
Length1012 mm
ID After Drilling121.4 mm
Anti-Internal Pressure108 MPa
Anti-External Extrusion80 MPa
Shear Pressure20-50 MPa (Adjustable)

Data source: Technical data table.

Dimensions

The rupture disc float collar is dimensioned to match standard casing sizes and connection types.

Casing SizeMax ODLengthConnection
5-1/2" (139.7 mm)178 mm1012 mmAPI Threads
Other sizesBy casing sizeBy casing sizeAPI Threads

Specific dimensions are confirmed against the selected casing specification at order.

Structure / Working Principle

In horizontal wells, the weight of the casing pressing against the open hole creates significant friction, making it difficult to reach total depth. The floating technique involves trapping air or low-density fluid in the lower section of the casing.

  • Blind Plate: The rupture disc float collar acts as a temporary barrier.
  • Floating Effect: By trapping air below the collar, buoyancy is increased, reducing the normal force on the wellbore wall. For example, with 5-1/2" casing in a 1000m horizontal section with 1.2 g/cm3 mud, conventional running gives a normal force of 27.7t; floating reduces this to 14.9t, cutting friction by 46%.
  • Opening the Well: Once the casing reaches total depth, pressure is applied from the surface. The non-metallic rupture disc breaks at the designed shear pressure (20-50 MPa), opening the circulation path for cementing.
  • Debris-Free: The disc breaks into fine powder that circulates out with the mud, preventing blockage.

Cross-Reference & Replacement

Upgrading your casing running plan for a horizontal well?

  1. Well Profile: Confirm if the horizontal section is long enough to require friction reduction (typically >1000m).
  2. Mud Density: Higher mud density increases buoyancy, making the floating effect more pronounced.
  3. Shear Pressure: Decide on the shear pressure required to break the disc based on your pump capacity and formation strength.

For standard vertical well float equipment, see the Float Collar & Float Shoe Series.

Applications

  • Horizontal Wells: Where casing friction prevents reaching total depth.
  • Extended Reach Wells (ERD): Reduces drag and torque during casing running.
  • Highly Deviated Wells: Assists in navigating complex well paths.

Pressure ratings apply to the tool assembly. Verify the shear pressure and pressure integrity against your well program before installation.

Selection Support

Planning a horizontal well and need to calculate the friction reduction? Send us your casing size, horizontal length, and mud density, and we will help you select the correct rupture disc float collar.

Frequently Asked Questions

Q: How does the rupture disc open?
A: It opens by applying hydraulic pressure from the surface. Once the pressure reaches the designed shear value (20-50 MPa), the disc ruptures, opening the circulation path.

Q: Will the broken disc block the float equipment?
A: No. The disc is made of a special non-metallic material that breaks into fine powder particles. These particles are easily circulated out of the well with the mud.

Q: Can the shear pressure be adjusted?
A: Yes. The shear pressure can be adjusted within the 20-50 MPa range before the job to match your specific operational requirements.

Q: What is the typical lead time?
A: Standard lead time is 4-6 weeks. For horizontal drilling campaigns, please contact us early to ensure availability.

Contact

For rupture disc float collar selection and horizontal well casing floating support, contact HYRIG: info@hyrig.com

Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit