On a VARCO TDS-10SA top drive, frequently used on workover rigs and light drilling units, the Upper IBOP 110103-500 is the primary mechanical barrier inside the drill string. Workover operations often involve pulling and running pipe under pressure; a reliable upper IBOP is critical.
Whenever the top drive disconnects from the drill pipe, the upper IBOP must be closed. This prevents:
Mud or completion fluid spilling onto the rig floor
Backflow from the drill string
Loss of hydrostatic head
Procedure: Stop circulating → Close upper IBOP → Observe pressure → Break connection.
When pulling pipe out of the hole during workover:
| Float valve present? | Upper IBOP position |
|---|---|
| Yes (operational) | Closed as backup only |
| No (float not used) | Must be closed at all times while tripping |
| Float valve failed | Close upper IBOP immediately |
When the well flows (positive kick indication), the driller must:
Stop rotation and pump.
Close the upper IBOP immediately.
Close the lower IBOP (if installed).
Close annular BOP.
Record shut-in drill pipe pressure (SIDPP) and shut-in casing pressure (SICP).
Circulating: Upper IBOP open
Not circulating: Upper IBOP closed
| Event | Action |
|---|---|
| Normal workover drilling | IBOP open |
| Kick detected | Stop pump → Close upper IBOP → Close BOPs |
| After BOPs closed | Record pressures |
| Prepare to circulate | Confirm IBOP closed, open lower IBOP slowly |
| Begin kill circulation | Open upper IBOP slowly, start pump |
| Pause circulation | Stop pump → Close upper IBOP |
| Kill complete, well static | Pressure test IBOP before opening |
| Barrier | Purpose |
|---|---|
| Upper IBOP 110103-500 | Stops flow inside drill pipe above top drive |
| Lower IBOP (114706-500) | Stops flow inside drill pipe below top drive (optional) |
| Annular BOP | Seals around the drill pipe in annulus |
| Ram BOPs | Shear or seal around pipe |
Test the upper IBOP every 14 days or before each workover job.
Cycle the valve every shift – ensures it will move when needed.
Post a visible procedure at the driller’s console.
Train workover crews – many incidents occur during trips and connections.
Keep a spare upper IBOP on location.
❌ Closing IBOP before stopping pump – pressure surge may damage seals.
❌ Forgetting to close IBOP before breaking connection – fluid spill and possible flow.
❌ Using IBOP as a choke – never partially open.
❌ Neglecting low-pressure test – small leaks may go undetected.
Attempt to close it using a cheater bar (controlled force).
If still open, use the lower IBOP if installed.
If no lower IBOP, strip back to BOPs and close annular.
Pump barite plug if necessary.
Equalize pressure across the valve.
Use a second T-handle or extension bar.
If still stuck, replace the IBOP at the next connection.
We provide:
Well control worksheets for TDS-10SA workover operations
Quick-reference card for driller’s console
API 16D test report templates
For training materials, emergency support, or spare IBOPs:
Email: info@hyrig.com
*Also available: Lower IBOP 114706-500 for dual barrier isolation on TDS-10SA.*
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.