YU-600 Dead Weight Tester | 0-60 MPa High Pressure

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
HYRIG can supply the YU-600 dead weight tester. The YU-600 is a high-pressure primary standard designed for calibrating general pressure gauges up to 60 MPa. It utilizes a hand-lift pump and 20# oil as the transmission medium.
Conatct For Details
DetailReview(0)Additional

Key Facts

  • Model: YU-600 (Hand-lift pump type)
  • Measuring Range: 0-60 MPa
  • Accuracy Class: 0.05
  • Weight: Approx. 1.75 kg (Base)
  • Transmission Medium: 20# oil
  • Applied Pressure of Hand-lift Pump: < 1 MPa

Key Specifications (Model Comparison)

ModelRangeMediumPump TypeAccuracy
YU-60A0-6 MPaTransformer oilHand-lift0.05
YU-6000-60 MPa20# oilHand-lift0.05
YU-600A0-60 MPa20# oilHand-lift0.05

Data source: Technical data table

Dimensions (Text-Based)

  • Overall Dimensions: 360 × 300 mm (Base), 470 mm (Length with wheel), 253 mm (Height)
  • Note: For detailed weight set configurations and connection sizes, please verify with our engineering team.

Structure / Working Principle

Similar to the YU-60A, the YU-600 uses a piston-cylinder system with 20# oil as the medium. Weights are placed on the piston to generate high pressure. It is a reliable primary standard for calibrating high-pressure gauges used in boilers, hydraulic systems, and power plants.

Cross-Reference & Replacement

Replacing an old high-pressure standard? Check:

  1. Medium: Confirm the use of 20# oil (not transformer oil).
  2. Range: Ensure the 60 MPa range covers your working pressure.
  3. Weights: Verify the weight set is complete and undamaged.

Selection Support

Need a lower pressure range? View the YU-60A Dead Weight Tester. Explore the full Precision Pressure Gauges series.

Applications

  • High-pressure calibration
  • Boiler and power plant maintenance
  • Laboratory and workshop

Disclaimer: This equipment is designed for high-pressure industrial applications. Ensure strict compliance with local safety standards and verify pressure ratings prior to installation.

Frequently Asked Questions

Q: What is the difference between YU-600 and YU-600A?
A: The YU-600A may include additional features or a different pump mechanism. Please contact our team for specific differences.

Q: What is the typical lead time?
A: Due to high-pressure testing requirements, lead time is typically 6-8 weeks.

Contact

For YU-600 dead weight tester selection, contact HYRIG: info@hyrig.com HYRIG is an industrial instrumentation supplier providing pressure gauges, transmitters, and related spare parts to process, oil & gas, and manufacturing operators worldwide.

Page last updated: 2026-10-27

Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit