ZQ127/25Y TEDA Drill Pipe Power Tong – Complete Operation Instructions

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
The ZQ127/25Y TEDA drill pipe power tong operation covers die seat selection (6 types for drill pipe, tubing and casing), die selection (2 types with steel marks 89-114 and 121-156), and suspended height adjustment via the lifting bucket valve (lift, drop, lock height). For break-out operations, the guide pole pin axle must be moved to the lowest hole. Proper selection and adjustment ensure reliable make-up and break-out of 2-3/8" to 5-1/2" pipe.

Conatct For Details
DetailReview(0)Additional

Proper operation of the ZQ127/25Y TEDA Drill Pipe Power Tong requires correct die seat and die selection, proper suspended height adjustment, and correct guide pole positioning for break‑out operations. This guide covers all operational aspects to ensure reliable make‑up and break‑out of drill pipe, tubing, and casing in well workover operations.

4.1 The Choice of Die Seats

Die seats are selected based on the pipe size and type being handled. Six die seat types are available, each identified by its part number, application range, and steel mark:

  • Die Seat (1) – Part No. ZQ25.1.1-7(1), Steel Mark 3-1/2": For 2-3/8" drill pipe and 3-1/2" tubing.

  • Die Seat (2) – Part No. ZQ25.1.1-7(2), Steel Mark 4": For 2-7/8" drill pipe and 4" tubing.

  • Die Seat (3) – Part No. ZQ25.1.1-7(3), Steel Mark 4-1/2": For 4-1/2" tubing, 3-1/2" tubing coupling, and 4-1/2" casing. This is a selection item.

  • Die Seat (4) – Part No. ZQ25.1.1-7(4), Steel Mark 5": For 3-1/2" drill pipe, 4" tubing coupling, 5" casing, and 4-1/2" casing coupling.

  • Die Seat (5) – Part No. ZQ25.1.1-7(5), Steel Mark 5-1/2": For 4-1/2" tubing coupling, 5-1/2" casing, and 5" casing coupling.

  • Die Seat (6) – Part No. ZQ25.1.1-7(6), Steel Mark 6-1/8": For 5-1/2" casing coupling. This is a selection item.

Choose die seats according to the seat marks and part numbers to ensure proper fit and gripping performance.

4.2 Choice of Dies

Two die types are available, selected based on the pipe size range:

  • Die Seat (2) – Part No. XYQ12.Z-01.12(2), Steel Mark 89-114: Suitable for 2-3/8" to 3-1/2" drill pipe, 3-1/2" to 4-1/2" tubing, 3-1/2" tubing coupling, and 4-1/2" casing.

  • Die Seat (3) – Part No. XYQ12.Z-01.12(3), Steel Mark 121-156: Suitable for 3-1/2" drill pipe, 4" to 4-1/2" tubing coupling, 5" to 5-1/2" casing, and 5" to 5-1/2" casing coupling.

Choose dies according to the steel marks and part numbers to ensure correct gripping of the pipe being handled.

4.3 Adjustment Method for the Suspended Height of Power Tong

The suspended height of the power tong is controlled using the lifting bucket valve. Three operations are available:

4.3.1 Lifting: Turn off the throttle valve of the lifting bucket valve, then open the stop valve. The power tong will be lifted to the desired height.

4.3.2 Drop: Open the throttle valve of the lifting bucket valve, then open the stop valve. The power tong will be dropped to the desired height.

4.3.3 Lock Height: When the power tong is lifted or dropped to the predetermined height, turn off the stop valve to lock the height. Then open the throttle valve, and the power tong can be worked in make‑up and break‑out conditions.

4.4 Guide Pole Pin Axle Position for Break-Out

The pin axle of the guide pole must be moved to the lowest hole when performing break‑out operations. This adjustment alters the geometry of the tong's clamping and torque reaction, allowing the tong to effectively transmit torque in the reverse direction. Failure to reposition the pin axle to the lowest hole during break‑out may result in insufficient gripping, erratic torque delivery, or potential damage to the tong's internal mechanism.

Operation Checklist

  • Select correct die seat based on pipe size and type

  • Select correct die based on steel mark and part number

  • Adjust suspended height using lifting bucket valve

  • Lift: turn off throttle, open stop valve

  • Drop: open throttle, open stop valve

  • Lock height: turn off stop valve, then open throttle

  • For break-out: move guide pole pin axle to lowest hole

Safety Notes

  • Always select die seats and dies that match the pipe size.

  • Ensure the power tong is properly suspended before operation.

  • Lock the height before commencing make‑up or break‑out operations.

  • For break‑out operations, always move the guide pole pin axle to the lowest hole.

  • Regularly inspect die seats and dies for wear.

For further operational support, training materials, or to request a demonstration, please contact us via email at info@hyrig.com.


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit