HYRIG supplies globe valves with both bolted and pressure-seal bonnets. This guide explains the mechanical difference, the pressure class boundary where pressure-seal becomes standard, and the maintenance implications for each design.
| Feature | Bolted Bonnet | Pressure-Seal Bonnet |
|---|---|---|
| Typical Pressure Class | Class 150 - 900 | Class 1500 - 2500 |
| Sealing Mechanism | Bolt load compresses gasket | Line pressure pushes seal ring against body |
| Bolting Size | Proportional to pressure class | Smaller, independent of pressure |
| Disassembly | Unbolt and lift | Remove seal ring, requires specific procedure |
| Weight | Increases with class | Lighter than equivalent bolted design |
| Dimension | Standard |
|---|---|
| Face-to-face | ASME B16.10 |
| Flanged ends | ASME B16.5 / B16.47 |
| Butt weld ends | ASME B16.25 |
A bolted bonnet uses studs and nuts to compress a gasket between the body and bonnet. As pressure class increases, the flange thickness and bolt size must increase to maintain sufficient gasket seating stress. Above Class 900, the bolts become very large and heavy, making assembly and disassembly difficult.
A pressure-seal bonnet uses a self-energizing seal. The bonnet is held in place by a retaining ring, and a soft metal gasket sits between the bonnet and the body. As internal pressure rises, it pushes the gasket outward and upward, increasing the sealing force. This means the seal gets tighter as pressure increases, and the bolting does not need to carry the full pressure load.
When replacing or maintaining globe valves:
Disclaimer: This equipment is designed for high-pressure industrial applications. Ensure strict compliance with local safety standards and verify pressure ratings prior to installation.
Q: At what pressure class should I use a pressure-seal bonnet?
Industry standard practice is to use pressure-seal bonnets for Class 1500 and 2500. Bolted bonnets are standard for Class 150-900.
Q: Can a pressure-seal bonnet be repaired in the field?
Yes, but it requires specific procedures and tools to release the retaining ring and replace the pressure-seal gasket. Follow the manufacturer's instructions.
Q: Is a pressure-seal bonnet lighter than a bolted bonnet?
Yes. Because the bolting does not need to carry the full pressure load, the flange and bolts can be smaller, reducing the overall valve weight at high pressure classes.
Q: What is the typical lead time?
Standard lead time is 4 to 6 weeks depending on size, class, and material.
To select the correct bonnet design, provide the line pressure class and maintenance requirements. Our engineers will confirm the configuration.