KT20000 Casing Tong: Standard Operating Procedure – Core Guide for Safe & Efficient Operations

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
The KT20000 casing tong standard operating procedure ensures safe and efficient make-up and break-out. Pre-operation: personnel must read manual and wear PPE (flame-resistant suit, helmet, boots, gloves); equipment check (jaw, hoses, torque gauge); hydraulic oil level and connections; site clearance and suspension (≥5/8″ wire rope). Make-up (6 steps): position tong, close safety door, insert pin (make-up hole), high gear (23 rpm) for spinning, low gear (3 rpm) for final torque (up to 70000 Nm), release. Break-out (5 steps): insert pin (break-out hole), low gear reverse for high torque (70000 Nm) to loosen, then separate. Post-op: shutdown, clean, log. Critical rules: never shift gears under load, safety door must be locked, no snap break, no hands near rotating parts. Contact info@hyrig.com.

Conatct For Details
DetailReview(0)Additional

Subtitle: From Installation to Post-Operation – Standardize Every Step for Zero Errors & Zero Risks


I. Pre-Operation Preparation: 3 Core Steps for a Safe Foundation

(A) Personnel & Qualification

  • Operators must read the KT20000 Casing Tong Operation & Maintenance Manual in full and pass safety and operation assessments before working.

  • Wear full PPE: flame-resistant coverall, impact-resistant helmet, puncture-resistant boots, non-slip gloves. No loose clothing or jewelry (risk of entanglement).

  • Clear role assignment: 1 main operator (controls), 1 field supervisor (safety and assistance). Single-person operation is prohibited.

(B) Equipment & Tool Inspection

Appearance & Components:

  • No deformation or cracks on tong body. Safety door operates smoothly and locks securely.

  • Jaws installed firmly. Rollers free of wear or breakage. Locating pins free of deformation or rust.

  • Hydraulic hoses – no damage or bulges. Fittings sealed with no oil leaks.

  • Torque gauge and pressure gauge display normally; pointer returns to zero with no sticking.

Hydraulic System:

  • Oil level between tank marks. Oil clean, no contamination or emulsification.

  • Hydraulic pump and motor connections secure, no looseness or aging. Grounding good.

  • Confirm high-pressure hose (1″) and return hose (1-1/4″) are correctly connected. Self-sealing couplers must click locked.

Auxiliary Tools:

  • Required: torque wrench, pipe wrench, grease, cleaning cloth, emergency tool kit.

  • Safety items: warning cones, safety tape, fire extinguisher (placed nearby).

(C) Site Environment

  • Clear work area of debris and obstacles. Set safety zone within 5 m radius – no unauthorized personnel.

  • Check suspension and fixing:

    • Suspension wire rope ≥5/8″ – no broken strands or rust. Connection points secure.

    • Level tong using turnbuckles. Align with casing center axis (tolerance ≤2°).

    • Backup line (≥5/8″ wire rope) connected horizontally at 90° to rear dynamometer. Anchor point secure (e.g., rig floor anchor) with no slack.


II. Core Operating Procedures: Standardized Make-up & Break-out Steps

(A) Common Start-Up (Before Make-up or Break-out)

  • Supervisor confirms site safety and signals operator to start.

  • Operator opens hydraulic system bypass valve, starts hydraulic pump motor, circulates oil for warm-up (5-10 minutes at ambient temperature; 20 minutes at -40°C to 0°C).

  • During warm-up, check hydraulic pressure (idle ≤200 PSI). Inspect hoses for leaks, listen for abnormal noise.

  • Move shift lever to neutral. Lightly push throttle control rod to test forward/reverse rotation. Confirm safety door interlock works (unit cannot start if door not locked).

  • Verify jaw size matches casing specification and locating pins are fully inserted.

(B) Make-Up Procedure (6 Steps for Precise Thread Tightening)

StepActionCaution
1Position tong: Operator and supervisor align tong opening with casing joint. Slide smoothly to gripping position. Ensure jaw contacts casing without gap.
2Lock safety door: Close door until double lock click (or lock indicator light). Supervisor confirms locked.
3Insert locating pin: Insert pin into make-up hole (not break-out hole). Tap fully to secure. Prevents pin falling during operation.
4Shift to high gear: Move lever from neutral down to high gear (23 rpm). For fast thread engagement.
5Controlled torque application: ① Push throttle 1/3 stroke for slow thread engagement (avoid damage). ② After full engagement, push throttle fully until tong nearly stops (initial tightening). ③ Shift to low gear (3 rpm), apply throttle to reach target torque per job requirement (range 10,000-70,000 N·m).
6Release and reset: Release throttle, move control rod to reverse to disengage jaw. Rotate tong to align safety door opening with casing. Unlock door, move tong away to designated position.

(C) Break-Out Procedure (5 Steps for Safe Thread Removal)

StepActionCaution
1Position tong: Align tong opening with casing joint. Ensure jaws fully wrap joint. Clean gripping surface (use cloth if oily or dirty).
2Lock safety door: Close and lock door. Supervisor reconfirms. Prevents tong falling if door not locked.
3Insert locating pin: Insert pin into break-out hole (marked with shadow). Ensure secure fit, no looseness.
4Low gear reverse operation: Shift lever up to low gear (3 rpm). Pull throttle fully to reverse direction. Use high torque (70,000 N·m) to break thread lock.
5Full loosening and removal: After joint loosens, continue low gear until threads separate. Lightly push throttle forward to disengage jaw. Align door opening with casing and move tong away.

III. Post-Operation Shutdown: 3 Steps to Reset Equipment & Site

  1. Shutdown sequence: Release throttle → shift lever to neutral → close hydraulic pump motor → open bypass valve to release system pressure → cut main power.

  2. Clean equipment: Wipe tong body, jaw gripping surfaces, hose fittings. Remove oil, mud, and debris. Pay attention to safety door gaps.

  3. Site organization: Remove safety tape and cones. Move tong to designated storage location. Hang "Cleaned – Ready for next use" tag. Fill out operation log (time, casing size, torque parameters, equipment condition).


IV. Critical Operating Rules & Prohibited Actions

Mandatory Rules

  • Maintain clear communication throughout operation. Operator and supervisor use fixed hand signals or two-way radio. No unauthorized operation.

  • Torque adjustments must follow job plan. Do not exceed rated torque (prevents pipe damage and gear fracture).

  • Pause after every 10 casing joints to inspect: jaw wear, locating pin condition, hydraulic hose sealing.

  • In extreme cold, hydraulic oil warm-up must be at least 20 minutes. Do not force start at low temperature.

Strictly Prohibited Actions

  • Do not start equipment with safety door unlocked or locating pin missing.

  • Do not use "snap break" (sudden throttle pull) for break-out – causes gear impact damage.

  • Do not place hands near rotating parts or step across hydraulic hoses. Do not stand under or place tools below tong body.

  • Do not use tong outside rated casing range (7″-20″).

  • Do not adjust relief valve pressure or remove safety interlock devices without authorization.


Contact Us

For operation training, safety support, or to request a copy of the full manual, please contact us:

info@hyrig.com

We provide comprehensive technical support and training for all TEDA casing power tongs, including the KT20000.


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit