Lower IBOP 114706-500 for VARCO TDS-10SA – Well Control & Safety

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
The Lower IBOP 114706-500 provides secondary well control on the VARCO TDS-10SA top drive, widely used in workover and snubbing operations. Backup barrier if upper IBOP fails, enables safe removal of upper IBOP under pressure, and supports pressure equalization.

Conatct For Details
DetailReview(0)Additional

The Role of the Lower IBOP in Workover Well Control

On a VARCO TDS-10SA top drive, frequently used on workover rigs and snubbing units, the Lower IBOP 114706-500 provides redundant isolation inside the drill string. Workover operations often involve pulling pipe under pressure, making dual IBOPs a safety standard.

Why Two IBOPs on TDS-10SA Workover Rigs?

ScenarioUpper IBOPLower IBOP
Normal workoverOpenOpen
Before breaking connectionClosedOpen (or closed)
Upper IBOP leaks when closedLeakingClosed – contains pressure
Upper IBOP fails to closeFailed openClosed – provides isolation
Need to service upper IBOPRemovedClosed – allows safe removal
Snubbing operationsClosedClosed (both required)

When to Close the Lower IBOP on TDS-10SA

1. As a Backup During Workover Well Control

Upon detecting a kick during workover, close both upper and lower IBOPs before closing BOPs.

Procedure: Stop pump → Close upper IBOP → Close lower IBOP → Close annular BOP.

2. When Upper IBOP Is Suspected of Leaking

If pressure testing shows a slow drop when upper IBOP alone is closed, close the lower IBOP. If pressure stabilizes, the upper IBOP needs maintenance.

3. To Allow Safe Maintenance of Upper IBOP (Live Well)

The lower IBOP can be closed and pressure bled off between the two valves. This creates a trapped pressure zone, allowing the upper IBOP to be removed and serviced while the workover string remains under pressure below.

4. During Snubbing Operations

When snubbing pipe into a live well, both IBOPs must be closed at all times except when actively pumping or moving pipe. The lower IBOP serves as the final backup.

Dual IBOP Operating Procedures for TDS-10SA

Pressure Equalization

Before opening the upper IBOP when there is pressure trapped below:

  1. Close upper IBOP.

  2. Close lower IBOP (trap pressure between them).

  3. Open a small bleed valve (if available) or crack the connection slowly.

  4. Once pressure equalizes, open upper IBOP.

Note: The 114706-500 does not have a built-in equalization port. Use a separate bleed valve or slowly crack the connection above the lower IBOP.

Upper IBOP Removal Under Pressure (Workover)

StepAction
1Close lower IBOP (114706-500).
2Bleed pressure from the space between upper and lower IBOP via top drive washpipe or bleed valve.
3Verify zero pressure.
4Remove upper IBOP.
5Lower IBOP holds well pressure below.

When Lower IBOP Becomes Primary Barrier

If upper IBOP fails (cannot close or leaks severely), the lower IBOP becomes the primary barrier. In this mode:

  • Do not open lower IBOP unless necessary.

  • Plan to replace upper IBOP at the next connection or trip.

  • If both IBOPs fail, rely on BOP stack and consider stripping.

Integration with BOP Stack for Workover

BarrierPurpose
Upper IBOP (110103-500)Primary internal barrier
Lower IBOP (114706-500)Secondary internal backup
Annular BOPSeals around workover string
Pipe RamsSeal around pipe
Shear RamsEmergency cut and seal

Best Practices for Workover Dual IBOP Operations

  • Test both IBOPs separately before each workover job.

  • Cycle both valves daily – workover strings can have debris that sticks valves.

  • Mark positions clearly – workover rigs often have multiple crews.

  • Train snubbing operators – dual IBOP failure procedures are critical.

Emergency Actions

If Lower IBOP 114706-500 Fails to Close:

  1. Upper IBOP is still available as primary barrier.

  2. Strip back to BOPs and close annular/rams.

  3. Replace lower IBOP at the next trip or workover string change.

If Both Upper and Lower IBOPs Fail:

  1. Immediately close annular BOP.

  2. Close pipe rams.

  3. Consider shear rams if well continues to flow.

  4. Pump barite plug or set bridge plug.

Common Mistakes to Avoid in Workover

  • ❌ Using lower IBOP as the primary barrier for routine connections.

  • ❌ Opening lower IBOP before verifying no pressure below.

  • ❌ Forgetting to close lower IBOP before removing upper IBOP.

  • ❌ Relying on lower IBOP as a choke – never partially open.

Documentation & Training

We provide:

  • Dual IBOP well control worksheets for workover operations

  • Quick-reference cards for workover driller’s console

  • API 16D test report templates

Contact for Well Control Advisory

For training materials, emergency support, or spare lower IBOPs:
Email: info@hyrig.com

*Also available: Upper IBOP 110103-500 to complete dual barrier isolation on TDS-10SA.*


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit