On a VARCO TDS-10SA top drive, frequently used on workover rigs and snubbing units, the Lower IBOP 114706-500 provides redundant isolation inside the drill string. Workover operations often involve pulling pipe under pressure, making dual IBOPs a safety standard.
| Scenario | Upper IBOP | Lower IBOP |
|---|---|---|
| Normal workover | Open | Open |
| Before breaking connection | Closed | Open (or closed) |
| Upper IBOP leaks when closed | Leaking | Closed – contains pressure |
| Upper IBOP fails to close | Failed open | Closed – provides isolation |
| Need to service upper IBOP | Removed | Closed – allows safe removal |
| Snubbing operations | Closed | Closed (both required) |
Upon detecting a kick during workover, close both upper and lower IBOPs before closing BOPs.
Procedure: Stop pump → Close upper IBOP → Close lower IBOP → Close annular BOP.
If pressure testing shows a slow drop when upper IBOP alone is closed, close the lower IBOP. If pressure stabilizes, the upper IBOP needs maintenance.
The lower IBOP can be closed and pressure bled off between the two valves. This creates a trapped pressure zone, allowing the upper IBOP to be removed and serviced while the workover string remains under pressure below.
When snubbing pipe into a live well, both IBOPs must be closed at all times except when actively pumping or moving pipe. The lower IBOP serves as the final backup.
Before opening the upper IBOP when there is pressure trapped below:
Close upper IBOP.
Close lower IBOP (trap pressure between them).
Open a small bleed valve (if available) or crack the connection slowly.
Once pressure equalizes, open upper IBOP.
Note: The 114706-500 does not have a built-in equalization port. Use a separate bleed valve or slowly crack the connection above the lower IBOP.
| Step | Action |
|---|---|
| 1 | Close lower IBOP (114706-500). |
| 2 | Bleed pressure from the space between upper and lower IBOP via top drive washpipe or bleed valve. |
| 3 | Verify zero pressure. |
| 4 | Remove upper IBOP. |
| 5 | Lower IBOP holds well pressure below. |
If upper IBOP fails (cannot close or leaks severely), the lower IBOP becomes the primary barrier. In this mode:
Do not open lower IBOP unless necessary.
Plan to replace upper IBOP at the next connection or trip.
If both IBOPs fail, rely on BOP stack and consider stripping.
| Barrier | Purpose |
|---|---|
| Upper IBOP (110103-500) | Primary internal barrier |
| Lower IBOP (114706-500) | Secondary internal backup |
| Annular BOP | Seals around workover string |
| Pipe Rams | Seal around pipe |
| Shear Rams | Emergency cut and seal |
Test both IBOPs separately before each workover job.
Cycle both valves daily – workover strings can have debris that sticks valves.
Mark positions clearly – workover rigs often have multiple crews.
Train snubbing operators – dual IBOP failure procedures are critical.
Upper IBOP is still available as primary barrier.
Strip back to BOPs and close annular/rams.
Replace lower IBOP at the next trip or workover string change.
Immediately close annular BOP.
Close pipe rams.
Consider shear rams if well continues to flow.
Pump barite plug or set bridge plug.
❌ Using lower IBOP as the primary barrier for routine connections.
❌ Opening lower IBOP before verifying no pressure below.
❌ Forgetting to close lower IBOP before removing upper IBOP.
❌ Relying on lower IBOP as a choke – never partially open.
We provide:
Dual IBOP well control worksheets for workover operations
Quick-reference cards for workover driller’s console
API 16D test report templates
For training materials, emergency support, or spare lower IBOPs:
Email: info@hyrig.com
*Also available: Upper IBOP 110103-500 to complete dual barrier isolation on TDS-10SA.*
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.