TEDA ZQ127/25 Hydraulic Drill Pipe Tong – High Torque Power Tong for Drill Pipe

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
The TEDA ZQ127/25 hydraulic drill pipe tong is a heavy-duty open-type power tong specifically designed for making up and breaking out drill pipe, tubing, and casing during oilfield workover, drilling, and well servicing operations. Features a two-speed gearbox: low gear torque 25,000 N·m (18,440 ft·lbs), high gear speed 52 RPM. Master tong range 2-3/8″–5″ (60–127 mm), backup range 2-3/8″–7″. Includes interlocking safety door. Weight 450 kg, rated pressure 14 MPa, flow 120 L/min. Suitable for onshore and offshore drilling and workover rigs.

Conatct For Details
DetailReview(0)Additional

Complete Technical Overview

The TEDA ZQ127/25 is a heavy-duty open-type hydraulic power tong specifically engineered for making up and breaking out drill pipe, tubing, and casing during oilfield drilling, workover, and well servicing operations. Designed to handle higher torque demands than standard tubing tongs, the ZQ127/25 delivers exceptional performance for drill pipe connections and large-diameter casing.

Key Specifications

  • Master Tong Range: 2-3/8″ – 5″ (60 – 127 mm)

  • Backup Tong Range: 2-3/8″ – 7″ (60 – 177.8 mm)

  • Low Gear Rated Torque: 25,000 N·m (18,440 ft·lbs) @ 14 MPa (2,030 psi)

  • High Gear Rated Torque: 6,500 N·m (4,795 ft·lbs) @ 14 MPa

  • Low Gear Rated Speed: 12 RPM

  • High Gear Rated Speed: 52 RPM

  • Rated System Pressure: 14 MPa (2,030 psi)

  • Rated Flow: 120 L/min (32 GPM)

  • Tong Head Opening (Master Tong): 132 mm (5.2″)

  • Weight (including backup tong): 450 kg (992 lbs)

  • Dimensions (L×W×H): 950 × 620 × 750 mm

Key Features

  • Two‑speed planetary gearbox – provides a low gear for high torque break‑out and a high gear for fast running of drill pipe and casing.

  • Open‑type tong head – allows quick positioning around the pipe string without threading.

  • Inner cam roller clamping mechanism – ensures self‑centering action and minimizes pipe damage.

  • Interlocking safety door – automatically stops the tong when the door is opened, protecting the operator.

  • Hydraulic torque indicator – standard, with interface for optional torque control system.

  • High-strength forged jaw plates – designed for long service life with drill pipe connections.

  • API 7K compliant – meets international drilling and workover equipment standards.

  • Optional torque control system – available for precise joint makeup torque measurement and recording.

Frequently Asked Questions

Q: What is the maximum torque of the TEDA ZQ127/25 hydraulic drill pipe tong?
A: Low gear rated torque is 25,000 N·m (18,440 ft·lbs) at 14 MPa system pressure. High gear rated torque is 6,500 N·m (4,795 ft·lbs). This torque range is suitable for making up and breaking out most drill pipe sizes and medium‑diameter casing.

Q: Which pipe sizes does the ZQ127/25 cover?
A: The master tong handles drill pipe and tubing from 2-3/8″ up to 5″ OD (60–127 mm). The backup tong handles up to 7″ OD casing. Common sizes include 2-3/8″, 2-7/8″, 3-1/2″, 4″, 4-1/2″, and 5″ drill pipe.

Q: What hydraulic power unit is required?
A: The ZQ127/25 requires 120 L/min flow at 14 MPa (2,030 psi). A standard drilling or workover power pack with 120–140 L/min capacity is recommended. An optional torque control system can be integrated.

Q: Is this tong suitable for offshore drilling rigs?
A: Yes. The ZQ127/25 is designed for both onshore and offshore applications. Corrosion‑resistant coatings and marine‑grade materials are available upon request.

Q: How does the ZQ127/25 differ from a standard tubing tong?
A: The ZQ127/25 is built with higher torque capacity (25 kN·m vs 9–12 kN·m for typical tubing tongs), a larger master tong opening (132 mm), and higher system pressure (14 MPa). It is specifically reinforced for drill pipe connections, which require greater make‑up torque than standard tubing.

Complete Product Introduction for engineers & procurement

The TEDA ZQ127/25 hydraulic drill pipe tong is a dedicated power tong for drill pipe handling, widely used in drilling rigs, workover units, and well servicing fleets across China, the Middle East, Southeast Asia, and South America. Its two‑speed planetary gearbox delivers high break‑out torque while maintaining efficient running speeds for long drill pipe strings.

The open tong head design allows rapid entry into and retreat from the working position, a critical feature for drill pipe connections where speed and safety are paramount. The inner cam roller gripping system provides self‑centering action, reducing wear on both the pipe and the jaw plates. Standard interlocking safety door stops all operation when open, ensuring operator protection.

The ZQ127/25 is fully compatible with torque‑turn systems and remote control handles. An optional torque control system can provide real‑time torque monitoring, display, recording, and control for critical drill pipe connections. The unit is pressure‑tested and functionally tested before shipment.

For drill pipe sizes above 5″ or torque requirements exceeding 25 kN·m, larger models such as the ZQ203/100 or ZQ203/125 are recommended. The ZQ127/25 is ideal for medium‑depth drilling and workover operations where 2-3/8″ to 5″ drill pipe is commonly used.

For detailed 2D/3D drawings, operation manual (PDF), spare parts list, or a quotation tailored to your rig’s hydraulic system, please contact us:

Email: info@hyrig.com


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit