Complete Technical Overview
The TEDA ZQ203-100 is a heavy-duty open-type hydraulic power tong specifically engineered for making up and breaking out large-diameter drill pipe, casing, and tubing during deep well drilling, heavy workover, and well servicing operations. With a maximum low gear torque of 100,000 N·m (73,750 ft·lbs), it is designed for demanding applications such as deep wells, high-torque connections, and stuck pipe recovery. This model is widely used on offshore drilling rigs, deep workover units, and large land rigs.
Key Specifications
Master Tong Range: 3-1/2″ – 7-5/8″ (88.9 – 193.7 mm)
Backup Tong Range: 3-1/2″ – 10″ (88.9 – 254 mm)
Low Gear Rated Torque: 100,000 N·m (73,750 ft·lbs) @ 16 MPa
High Gear Rated Torque: 25,000 N·m (18,440 ft·lbs) @ 16 MPa
Low Gear Rated Speed: 3 – 6 RPM
High Gear Rated Speed: 12 – 24 RPM
Rated System Pressure: 16 MPa (2,320 psi)
Rated Flow: 200 L/min (53 GPM)
Tong Head Opening (Master Tong): 210 mm (8.27″)
Weight (including backup tong): 1,850 kg (4,079 lbs)
Dimensions (L×W×H): 1,450 × 900 × 1,100 mm (57″ × 35.4″ × 43.3″)
Key Features
Two‑speed planetary gearbox – delivers extremely high low‑gear torque (100 kN·m) for breaking out the tightest drill pipe connections, while high gear provides faster running for lighter operations.
Large‑opening tong head – 210 mm opening accommodates up to 7-5/8″ drill pipe and 10″ casing with optional backup jaws.
Inner cam roller clamping mechanism – provides self‑centering grip with minimal pipe damage, even at maximum torque.
Interlocking safety door – automatically stops all motion when the door is opened, protecting the operator.
Hydraulic torque indicator – standard, with interface for optional torque control and recording system.
API 7K compliant – meets international drilling and workover equipment standards.
Heavy‑duty construction – reinforced frame and large gear train for extended service life in high‑torque applications.
Optional torque control system – provides real‑time torque monitoring, display, recording, and precise control for critical connections.
Optional hydraulic suspension – for easy height adjustment during operation.
Frequently Asked Questions
Q: What is the maximum torque of the TEDA ZQ203-100 hydraulic drill pipe tong?
A: Low gear rated torque is 100,000 N·m (73,750 ft·lbs) at 16 MPa system pressure. High gear rated torque is 25,000 N·m (18,440 ft·lbs). This makes the ZQ203-100 suitable for the largest drill pipe and heavy casing connections encountered in deep drilling and workover operations.
Q: Which pipe sizes does the ZQ203-100 cover?
A: The master tong handles drill pipe and casing from 3-1/2″ up to 7-5/8″ OD (88.9–193.7 mm). The backup tong can accommodate up to 10″ OD casing. Common sizes include 3-1/2″, 4″, 4-1/2″, 5″, 5-1/2″, 6-5/8″, 7″, and 7-5/8″.
Q: What hydraulic power unit is required for the ZQ203-100?
A: The tong requires a hydraulic power unit delivering 200 L/min flow at 16 MPa (2,320 psi) minimum. Most large workover rigs and drilling rigs have a power pack in this range. An optional torque control system can be integrated for precision makeup.
Q: Is this tong suitable for offshore drilling rigs?
A: Yes. The ZQ203-100 is widely used on offshore platforms and jack‑up rigs. All critical components are designed for marine environments, and corrosion‑resistant coatings are available upon request.
Q: How does the ZQ203-100 compare to smaller models like the ZQ127/25?
A: The ZQ203-100 delivers four times the low‑gear torque (100 kN·m vs 25 kN·m), handles larger pipe diameters (up to 7-5/8″ vs 5″), and is significantly heavier (1,850 kg vs 450 kg). It is intended for deep wells, large casing strings, and severe break‑out conditions where smaller tongs cannot generate sufficient torque.
Complete Product Introduction for engineers & procurement
The TEDA ZQ203-100 hydraulic drill pipe tong is a high‑capacity power tong designed for the most demanding drill pipe and casing handling applications. It is frequently deployed on deep drilling rigs, offshore platforms, heavy workover units, and well servicing fleets where standard tubing tongs or smaller drill pipe tongs lack sufficient torque.
The two‑speed planetary gearbox is engineered for reliability under extreme loads. Low gear operation (3–6 RPM) provides controlled, high‑torque output for breaking out corroded or over‑torqued connections. High gear (12–24 RPM) allows efficient running of long drill pipe or casing strings when lower torque is sufficient. The open tong head design enables rapid positioning around the pipe string without threading, a critical feature for deep well operations where connection speed matters.
The inner cam roller clamping mechanism ensures self‑centering action and minimizes pipe surface damage, even at maximum torque. The interlocking safety door stops all tong motion when opened, providing operator protection. A standard hydraulic torque indicator provides real‑time feedback, and an optional torque control system can be added for precise torque measurement, display, recording, and control – essential for premium threads and critical connections.
The ZQ203-100 is fully compatible with torque‑turn systems and remote control handles. Optional equipment includes a hydraulic suspension system for height adjustment, lengthening guide pole assemblies, and custom jaw sets for specific pipe sizes or thread types. Every unit is hydrostatically pressure‑tested and functionally tested before shipment.
For detailed 2D/3D drawings, operation manual (PDF), spare parts list, or a quotation tailored to your rig’s hydraulic system, please contact us:
Email: info@hyrig.com
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.