Complete Technical Overview
The TEDA ZQ203/125 is a heavy-duty open-type hydraulic power tong specifically engineered for making up and breaking out large-diameter drill pipe, casing, and tubing during ultra-deep well drilling, heavy workover, and offshore well servicing operations. With a maximum low gear torque of 125,000 N·m (92,200 ft·lbs), it is one of the most powerful hydraulic tongs in the TEDA ZQ series, designed for the most demanding applications including stuck pipe recovery, large casing strings, and high-torque premium connections.
Key Specifications
Master Tong Range: 3-1/2″ – 8″ (88.9 – 203.2 mm)
Backup Tong Range: 3-1/2″ – 10-3/4″ (88.9 – 273 mm)
Low Gear Rated Torque: 125,000 N·m (92,200 ft·lbs) @ 16 MPa
High Gear Rated Torque: 30,000 N·m (22,130 ft·lbs) @ 16 MPa
Low Gear Rated Speed: 2 – 5 RPM
High Gear Rated Speed: 10 – 20 RPM
Rated System Pressure: 16 MPa (2,320 psi)
Rated Flow: 220 L/min (58 GPM)
Tong Head Opening (Master Tong): 220 mm (8.66″)
Weight (including backup tong): 2,100 kg (4,630 lbs)
Dimensions (L×W×H): 1,550 × 950 × 1,150 mm (61″ × 37.4″ × 45.3″)
Key Features
Two‑speed planetary gearbox – delivers extreme low‑gear torque (125 kN·m) for breaking out the tightest drill pipe and casing connections, while high gear provides efficient running for lighter operations.
Large‑opening tong head – 220 mm opening accommodates drill pipe up to 8″ OD and casing up to 10-3/4″ with optional backup jaws.
Inner cam roller clamping mechanism – ensures self‑centering grip and minimizes pipe damage even at maximum torque.
Interlocking safety door – automatically stops all motion when the door is opened, ensuring operator safety.
Hydraulic torque indicator – standard, with interface for optional torque control and recording system.
API 7K compliant – meets international drilling and workover equipment standards.
Reinforced heavy‑duty construction – oversized gears, large bearing supports, and reinforced frame for extended service life under extreme torque.
Optional torque control system – provides real‑time torque monitoring, display, recording, and precise control for critical premium connections.
Optional hydraulic suspension – for easy height adjustment during operation on large rigs.
Frequently Asked Questions
Q: What is the maximum torque of the TEDA ZQ203/125 hydraulic drill pipe tong?
A: Low gear rated torque is 125,000 N·m (92,200 ft·lbs) at 16 MPa system pressure. High gear rated torque is 30,000 N·m (22,130 ft·lbs). This torque capacity is suitable for the largest drill pipe connections, heavy casing strings, and severe break‑out conditions encountered in ultra‑deep wells and offshore operations.
Q: Which pipe sizes does the ZQ203/125 cover?
A: The master tong handles drill pipe and casing from 3-1/2″ up to 8″ OD (88.9–203.2 mm). The backup tong can accommodate up to 10-3/4″ OD casing. Common sizes include 3-1/2″, 4″, 4-1/2″, 5″, 5-1/2″, 6-5/8″, 7″, 7-5/8″, 8″, and 9-5/8″ casing with optional jaws.
Q: What hydraulic power unit is required for the ZQ203/125?
A: The tong requires a hydraulic power unit delivering 220 L/min flow at 16 MPa (2,320 psi) minimum. This is typically available on large workover rigs, offshore platforms, and deep drilling rigs. An optional torque control system can be integrated for precision makeup.
Q: Is this tong suitable for offshore drilling rigs?
A: Yes. The ZQ203/125 is specifically designed for demanding offshore environments. Corrosion‑resistant coatings, stainless steel fasteners, and marine‑grade seals are available or standard. It is widely used on jack‑up rigs, semi‑submersibles, and drilling ships.
Q: How does the ZQ203/125 compare to the ZQ203-100 model?
A: The ZQ203/125 delivers 25% higher low‑gear torque (125 kN·m vs 100 kN·m), handles slightly larger pipe (8″ vs 7-5/8″), and has a higher flow requirement (220 L/min vs 200 L/min). It is intended for ultra‑deep wells and the most severe make‑up/break‑out conditions where maximum torque is required.
Complete Product Introduction for engineers & procurement
The TEDA ZQ203/125 hydraulic drill pipe tong is the highest‑torque model in the TEDA ZQ series, designed for extreme drilling and workover applications. It is deployed on ultra‑deep drilling rigs, heavy offshore workover units, and large land rigs where standard drill pipe tongs cannot generate sufficient torque.
The two‑speed planetary gearbox is engineered for maximum reliability under extreme loads. Low gear operation (2–5 RPM) provides controlled, ultra‑high torque output for breaking out severely corroded, over‑torqued, or stuck connections. High gear (10–20 RPM) allows efficient running of long drill pipe or casing strings when lower torque is sufficient. The open tong head design with 220 mm opening enables rapid positioning around the largest drill pipe and casing strings.
The inner cam roller clamping mechanism provides self‑centering action and minimizes pipe surface damage, even at maximum torque. The interlocking safety door stops all tong motion when opened, providing essential operator protection. A standard hydraulic torque indicator provides real‑time feedback, and a full torque control system is optionally available for precise torque measurement, display, recording, and closed‑loop control – critical for premium threads used in deep wells.
The ZQ203/125 is fully compatible with torque‑turn systems and remote control handles. Optional equipment includes a hydraulic suspension system for height adjustment, lengthening guide pole assemblies, custom jaw sets for specific pipe sizes or thread types, and corrosion‑resistant finishes for offshore service. Every unit is hydrostatically pressure‑tested and functionally tested before shipment.
For detailed 2D/3D drawings, operation manual (PDF), spare parts list, or a quotation tailored to your rig’s hydraulic system, please contact us:
Email: info@hyrig.com
total 0 Sheet,Only 5 images can be uploaded, each less than 5m.