5 1/8″ 15K Quad BOP Equalizer | Pressure Balance

2026-11-14 20:27

Key Facts

  • Working pressure: 15,000 psi max
  • Service: H2S
  • Equalizer type: flanged needle valve system
  • Sealing ram pairing: required
  • Shear and slip ports: blanked in standard configuration
  • Needle valve operation: 5/16″ allen wrench
  • Equalizer capscrew torque: 30 ft.lbs max
  • Data source: Technical data and parts list

Key Specifications & Model Comparison

ParameterValue
Working pressure15,000 psi max
ServiceH2S
Equalizer valveNeedle valve
Valve adjustment5/16″ allen wrench
Capscrew torque30 ft.lbs max
Blanked portsShear and slip positions in standard configuration

Dimensions

ItemValue
Flange type15K flanged equalizing system
Capscrew torque30 ft.lbs max
Needle valve seatThread in until seated; do not over-torque

Structure / Working Principle

Each sealing ram assembly uses a single-point equalizing system. Partially unthreading the needle valve opens a path from below the ram to above the ram, equalizing pressure. During normal operation, thread the needle valve in until it seats to block the path. The equalizer assembly must be used with sealing rams. Shear and slip ram equalizer ports are blanked off in the standard configuration.

Cross-Reference & Replacement

Looking to replace an equalizer needle valve or equalizer assembly? Check flange type, needle valve part number and sealing ram position. See 5 1/8″ 15K Quad BOP, Quad BOP Parts and Pipe Seal Ram Assembly.

Applications

  • Equalizing pressure before opening blind or pipe sealing rams
  • Servicing equipment above the BOP after bleeding pressure
  • Preventing pressure surge damage to ram or hydraulic assemblies
  • H2S service up to 15,000 psi working pressure

Disclaimer: This equipment is designed for high-pressure industrial applications. Ensure strict compliance with local safety standards and verify pressure ratings prior to installation.

Selection Support

Confirm equalizer port location, sealing ram configuration and needle valve part number before ordering. HYRIG can review the BOP serial number and equalizer drawing reference.

Frequently Asked Questions

Q: Why must pressure be equalized before opening rams?
A: Equalization prevents a pressure surge that can damage ram or hydraulic assemblies.

Q: How is the equalizer needle valve operated?
A: Partially unthread the needle valve with a 5/16″ allen wrench to equalize pressure.

Q: Which ram positions use equalizer assemblies?
A: Sealing ram positions use equalizer assemblies; shear and slip ports are blanked in the standard configuration.

Q: What torque is used for equalizer capscrews?
A: Equalizer capscrews are tightened to 30 ft.lbs maximum.

Q: Is this an OEM catalog page?
A: No. It describes equalizer operation documented in the operation and maintenance manual.

Contact

For 5 1/8″ 15K Quad BOP equalizer selection and replacement valves, contact HYRIG: info@hyrig.com

Related Pages

Name:
Message:
Verification code:
Submit
Comment