Lower IBOP 114706-500 for VARCO TDS-4SA – Installation & Maintenance Guide

QR code
share
WeChat
Sina Weibo
QQ
QQ space
Douban
Baidu Post Bar
copy Link
Facebook
X
LinkedIn
Pinterest
Line
Tumblr
Installation and maintenance instructions for Lower IBOP 114706-500 on VARCO TDS-4SA top drive. Includes thread preparation, torque requirements, pressure testing per API 16D, seal replacement schedule, and troubleshooting.

Conatct For Details
DetailReview(0)Additional

Proper Installation Procedure

Correct installation of the Lower IBOP 114706-500 on a VARCO TDS-4SA top drive ensures reliable secondary well control.

Installation Sequence (Dual IBOP Configuration)

Order from top drive down:

  1. Top drive spindle

  2. Upper IBOP 110103-500

  3. Lower IBOP 114706-500 (this product)

  4. Saver sub (optional)

  5. Drill pipe

Before Installation

  1. Inspect the IBOP – Check for shipping damage, clean all surfaces.

  2. Verify threads – Confirm top and bottom connections match adjacent components.

  3. Check seal condition – Ensure NBR seals are not cracked or hardened.

  4. Prepare thread compound – Use API 7-1 approved thread lubricant.

Installation Steps

StepAction
1Apply thread compound to both the Lower IBOP top threads and mating connection (upper IBOP bottom).
2Hand-thread the Lower IBOP onto the upper IBOP until finger tight.
3Use a torque wrench to tighten to 13,500 – 15,000 N·m (10,000 – 11,000 ft·lbs).
4Attach the T-handle and verify smooth operation.
5Connect the bottom string (saver sub or drill pipe) to the lower IBOP bottom thread (use same compound).

Pressure Testing After Installation

Per API 16D, test the lower IBOP both independently and as part of the assembly:

  1. Close lower IBOP, open upper IBOP. Apply 500 psi from below. Hold 5 minutes. No visible leakage.

  2. Close lower IBOP, open upper IBOP. Apply 5,000 psi from below. Hold 5 minutes. No pressure drop.

  3. Both IBOPs closed – test lower IBOP seal while upper IBOP is open.

  4. Both IBOPs open – perform shell test on lower IBOP (7,500 psi).

Maintenance Schedule

IntervalAction
Daily / each tourCycle the valve fully open and closed. Check for smooth operation.
WeeklyVisual inspection for damage or corrosion.
Per API 16D (14 days)Pressure test (low and high). Record results.
After 300 cycles or 6 monthsReplace seals (repair kit). Inspect ball and seats.
After a well control eventDisassemble, inspect, replace seals regardless of cycle count.

Seal Replacement (Repair Kit)

The 114706-500 uses a standard NBR seal kit. Replacement procedure is similar to upper IBOP.

Repair kit part number: Contact info@hyrig.com for kit details.

Troubleshooting

ProblemPossible CauseSolution
Hard to turnMud residue insideFlush with clean fluid, lubricate
Hard to turnDifferential pressure too highEqualize pressure across valve
Leaks when closedWorn seat or ballReplace seals, inspect ball
Thread gallingInsufficient thread compoundClean threads, reapply compound
Cannot close fullyDebris in ball cavityRemove IBOP, disassemble and clean

Safety Notes

  • Always equalize pressure across the lower IBOP before operating it.

  • Use proper lifting equipment – IBOP weight approx. 50 kg (110 lbs).

  • Never use the lower IBOP as a choke – only fully open or fully closed.

Contact for Maintenance Support

For repair kits, special tools, or field service assistance:
Email: info@hyrig.com



Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit