The Lower IBOP 114706-500 provides secondary well control on the VARCO TDS-4SA top drive. It serves as a backup barrier if the upper IBOP fails, allows pressure equalization, and enables safe maintenance of the upper IBOP. Learn dual IBOP well control procedures.

Conatct For Details
DetailReview(0)Additional

The Role of the Lower IBOP in Dual Barrier Well Control

On a VARCO TDS-4SA top drive, the Lower IBOP 114706-500 provides redundant isolation inside the drill string. While the upper IBOP (110103-500) is the primary barrier, the lower IBOP is the secondary barrier. API 16D recommends dual IBOPs for critical wells.

Why Two IBOPs?

ScenarioUpper IBOPLower IBOP
Normal drillingOpenOpen
Before breaking connectionClosedOpen (or closed)
Upper IBOP leaks when closedLeakingClosed – contains pressure
Upper IBOP fails to closeFailed openClosed – provides isolation
Need to service upper IBOPRemovedClosed – allows safe removal

When to Close the Lower IBOP

1. As a Backup During Well Control

Upon detecting a kick, the driller closes both upper and lower IBOPs. This ensures that even if the upper IBOP has minor leakage, the lower IBOP holds pressure.

Procedure: Stop pump → Close upper IBOP → Close lower IBOP → Close BOPs.

2. When Upper IBOP Is Suspected of Leaking

If pressure testing shows a slow drop when upper IBOP alone is closed, close the lower IBOP to confirm isolation. If pressure stabilizes, the upper IBOP requires maintenance.

3. To Allow Safe Maintenance of Upper IBOP

The lower IBOP can be closed and pressure bled off between the two valves. This creates a trapped pressure zone, allowing the upper IBOP to be removed and serviced while the drill string remains under pressure below.

4. During Long Trips (Without Float Valve)

When tripping pipe out of the hole and no float valve is present, both IBOPs should be closed at all times for absolute isolation.

Dual IBOP Operating Procedures

Pressure Equalization

Before opening the upper IBOP when there is pressure trapped below, use the lower IBOP to equalize:

  1. Close upper IBOP.

  2. Close lower IBOP (trap pressure between them).

  3. Open a small bleed valve (if available) or crack the connection slowly.

  4. Once pressure equalizes, open upper IBOP.

Note: The 114706-500 does not have a built-in equalization port. Equalization is done via a separate bleed valve or by gradually cracking the connection above the lower IBOP.

Upper IBOP Removal Under Pressure

StepAction
1Close lower IBOP (114706-500).
2Bleed pressure from the space between upper and lower IBOP via top drive washpipe or bleed valve.
3Verify zero pressure.
4Remove upper IBOP.
5Lower IBOP holds well pressure below.

When Lower IBOP Becomes Primary Barrier

If upper IBOP fails (cannot close or leaks severely), the lower IBOP becomes the primary barrier. In this mode:

  • Do not open lower IBOP unless necessary.

  • Plan to replace upper IBOP at the next connection.

  • If both IBOPs fail, rely on BOP stack and consider stripping.

Integration with BOP Stack

BarrierPurpose
Upper IBOP (110103-500)Primary internal barrier
Lower IBOP (114706-500)Secondary internal backup
Annular BOPSeals around drill pipe in annulus
Ram BOPsShear or pipe rams

Best Practices for Dual IBOP Operations

  • Test both IBOPs separately – lower IBOP test with upper IBOP open, then both closed.

  • Cycle both valves daily – ensure each can move freely.

  • Mark positions clearly – use visual indicators for open/closed.

  • Drill crew training – practice dual IBOP failure scenarios.

Emergency Actions

If Lower IBOP 114706-500 Fails to Close:

  1. Upper IBOP is still available as primary barrier.

  2. Strip back to BOPs and close annular/rams.

  3. Replace lower IBOP at the next trip.

If Both Upper and Lower IBOPs Fail:

  1. Immediately close annular BOP.

  2. If possible, close pipe rams.

  3. Consider shear rams if well continues to flow.

  4. Pump barite plug.

Common Mistakes to Avoid

  • ❌ Using lower IBOP as the primary barrier for routine connections (use upper IBOP first).

  • ❌ Opening lower IBOP before verifying no pressure below.

  • ❌ Forgetting to close lower IBOP before removing upper IBOP.

  • ❌ Relying on lower IBOP as a choke – never partially open.

Documentation & Training

We provide:

  • Dual IBOP well control worksheets

  • Quick-reference cards for driller’s console

  • API 16D test report templates

Contact for Well Control Advisory

For training materials, emergency support, or spare lower IBOPs:
Email: info@hyrig.com

*Also available: Upper IBOP 110103-500 to complete dual barrier isolation.*