API 610 VS6 cryogenic pump – higher initial cost but lower TCO over 20 years. Eliminates mechanical seal failure, reduces energy consumption by up to 15%. Field data shows efficiency up to 80.2% vs. 68‑69% for competitors.

Conatct For Details
DetailReview(0)Additional

Field Efficiency Comparison – LNG Terminal Case Study

Independent technical comparison of major cryogenic in‑tank pump suppliers at the same LNG terminal duty (Q = 319 m³/h, H = 275 m):

SupplierEfficiencyNPSHr
Our API 610 VS680.2%0.37 m
Competitor A (Nikkiso)69.5%0.50 m
Competitor B (Ebara)68.1%0.58 m

Higher efficiency directly translates to reduced operating costs. For a typical 9‑pump LNG terminal, the efficiency differential can generate annual savings exceeding RMB 2 million in electricity alone.

Direct Cost Savings over 20 Years

Cost factorStandard pumpAPI 610 VS6 cryogenic pump
Mechanical seal leakageFrequent (dynamic seal)None (static electrical penetration only)
Seal replacement labourEvery 2‑3 yearsNot required
Energy consumptionBaseline5‑15% lower
Unplanned downtime (days/year)3‑5 days<1 day
Total 20‑year lifecycle costHigherLower by 25‑40%

Environmental & Safety Benefits

  • Zero fugitive emissions – No shaft seal eliminates methane slip from LNG pumps.

  • Avoided production loss – Submerged unit eliminates dry‑run and cavitation failures.

  • Lower maintenance frequency – Bearing L10 life ≥25,000 hours.

Payback Period

The higher initial investment of an API 610 VS6 cryogenic pump is typically recovered in 12‑24 months through reduced energy consumption, eliminated seal maintenance and extended overhaul intervals.


For any inquiries, please contact: info@hyrig.com


Comment

comment
Name
Praise degree
Message:
Upload pictures:
    total 0 Sheet,Only 5 images can be uploaded, each less than 5m.
    Verification code
    Submit